Operating Javad and Septentrio receivers in parallel via splitters
	Javad ref rx - external freq, default tracking loop settings
	Javad PTU rx - external freq, default tracking loop settings
		(not using Geo++ settings quite yet)
	Septentrio rx - no exteral freq, default tracking loop settings
	  (BASE TESTING TO COMPARE JAVAD AGAINST HOW i'VE BEEN COLLECTING
	   DATA UP UNTIL THIS POINT ON SEPTENTRIO RX)

12nov09

1752	NISTTime executed to sync clock

  PTU parameters (BASE SETTINGS)
	speed ps/ts		800
	delta speed pd/td	0
	base speed pb/tb	57
	speed bounds
		upper pu/tu	1985
		lower pl/tl	0


1830 UTC  ACCELERATION TEST
  files
	schedule PTU_Schedule_pan30sec_1830.txt
	output position Position_pan30sec_1830
      septentrio file: SEPT314S.12_
      javad files: PTU <rinex>; 689_1109zzw.jps
  scenarios
	1830-1840	pan acceleration (pa) = 2000	
	1840-1850	pan acceleration (pa) = 1000
	1850-1900	pan acceleration (pa) = 500
  






