Shared Solution

PID: BBGN83
Designation: BEE CONTROL
Stamping: NONE
Stability: May hold, commonly subject to ground movement
Setting: Footings of small/medium structures
Description: Mark is orange spray paint. Mark would be expected to fade with time. Future users should relocate mark by measuring from edges of concrete headgate structure. Mark is 0.4' from road side of headgate, centered Upstream/Downstream on headgate, 4' S of road edge, 11' N of rock face, 375' E of Bee Diversion Dam. Installed as control for Bee Diversion Dam fish passage project.

Note - A disk may be installed at this location in the future.
Observed: 2019-08-06T16:08:00Z
Source: OPUS - page5 1603.24
Close-up View
REF_FRAME:   NAD_83(2011) EPOCH:   2010.0000 SOURCE:   NAVD88 (Computed using GEOID18) UNITS:  m  SET PROFILE   DETAILS
LAT: 40° 28' 7.29055" ±  0.015   m
LON: -122° 39'  3.29749" ±   0.007   m
ELL HT: 285.779 ±   0.037   m
X: -2621690.938 ±   0.015  m
Y: -4091408.897 ±   0.035  m
Z: 4117901.137 ±   0.012  m
ORTHO HT: 313.566 ±  0.079   m
UTM  10 SPC  401(CA 1)
NORTHING: 4479838.049m 626272.333m
EASTING: 529593.012m 1944802.868m
CONVERGENCE: 0.22656944° -0.42562500°
POINT SCALE: 0.99961078 0.99991497
COMBINED FACTOR: 0.99956597 0.99987015
CONTRIBUTED BY
mark_gard
US Fish and Wildlife Service
Horizon View
The numerical values for this position solution have satisfied the quality control criteria of the National Geodetic Survey. The contributor has verified that the information submitted is accurate and complete.