Shared Solution

PID: BBFH75
Designation: 945 5090 B
Stamping: 5090 B 1978
Stability: Monument will probably hold position well
Setting: Object surrounded by mass of concrete
Mark Condition: G
Description: Mark recovered as described.
Observed: 2023-08-10T17:20:00Z more obs 2022-07-05
Source: OPUS - page5 2008.25
Close-up View
REF_FRAME:   NAD_83(2011) EPOCH:   2010.0000 SOURCE:   NAVD88 (Computed using GEOID12B) UNITS:  m  SET PROFILE   DETAILS
LAT: 60° 7' 19.09546" ±  0.007   m
LON: -149° 26'  4.33291" ±   0.003   m
ELL HT: 18.442 ±   0.059   m
X: -2742731.154 ±   0.021  m
Y: -1619815.971 ±   0.012  m
Z: 5507275.188 ±   0.055  m
ORTHO HT: 6.407 ±  0.267   m
UTM  6 SPC  5004(AK 4)
NORTHING: 6667487.433m 681812.302m
EASTING: 364727.835m 531433.223m
CONVERGENCE: -2.11127500° 0.49031111°
POINT SCALE: 0.99982424 0.99991210
COMBINED FACTOR: 0.99982135 0.99990921
CONTRIBUTED BY
kyle.fernish
NOAA, National Geodetic Survey
Horizon View
The numerical values for this position solution have satisfied the quality control criteria of the National Geodetic Survey. The contributor has verified that the information submitted is accurate and complete.