Shared Solution

PID: BBDV28
Designation: 943 5380 M
Stamping: 5380 M 2014
Stability: Monument will probably hold position well
Setting: Mat foundation or concrete slab other than pavement
Mark Condition: G
Description: THE BENCH MARK IS A DISK SET FLUSH IN THE CONCRETE PAD SUPPORTING A LARGE BOLLARD ON THE EAST SATELLITE PLATFORM OF THE OSU SHIP OPERATIONS PIER. THE MARK IS 80 M (262.5 FT) SOUTHEAST OF BENCH MARK G, 29.3 M (96.1 FT) SOUTHEAST OF THE ENTRANCE TO THE CATWALK ON THE EAST EDGE OF THE PIER, 2.8 M (9.2 FT) SOUTH OF THE CENTER OF THE BOLLARD SET IN THE CENTER OF THE PLATFORM AND 1.9 M
(6.2 FT) NORTH OR THE SOUTH CORNER OF THE BOLLARD PLATFORM.
Observed: 2021-08-17T16:57:00Z more obs 2016-05-31
Source: OPUS - page5 2008.25
Close-up View
REF_FRAME:   NAD_83(2011) EPOCH:   2010.0000 SOURCE:   NAVD88 (Computed using GEOID18) UNITS:  m  SET PROFILE   DETAILS
LAT: 44° 37' 31.20906" ±  0.009   m
LON: -124° 2' 38.25269" ±   0.001   m
ELL HT: -19.733 ±   0.004   m
X: -2545497.486 ±   0.004  m
Y: -3767616.696 ±   0.008  m
Z: 4457797.598 ±   0.004  m
ORTHO HT: 4.126 ±  0.044   m
UTM  10 SPC  3601(OR N)
NORTHING: 4941861.348m 112696.574m
EASTING: 417185.531m 2218862.244m
CONVERGENCE: -0.73338889° -2.51332500°
POINT SCALE: 0.99968434 0.99993926
COMBINED FACTOR: 0.99968743 0.99994235
CONTRIBUTED BY
eric.white
National Ocean Service
Horizon View
The numerical values for this position solution have satisfied the quality control criteria of the National Geodetic Survey. The contributor has verified that the information submitted is accurate and complete.