Shared Solution

PID: BBCN53
Designation: 941 5009 A
Stamping: 5009 A 1979
Stability: Monument will probably hold position well
Setting: Retaining wall or concrete ledge
Description: Set in the North retaining wall of the northernmost barge loading ramp at the Basalt Rock Company, 274 m N of the hopper structure adjacent to a rock crusher, 18 m west of the pier running parallel to the shore, 5.0 m north of the centerline of the ramp.
Observed: 2011-10-26T15:32:00Z
Source: OPUS - page5 1209.04
Close-up View
REF_FRAME:   NAD_83(2011) EPOCH:   2010.0000 SOURCE:   NAVD88 (Computed using GEOID18) UNITS:  m  SET PROFILE   DETAILS
LAT: 37° 59' 18.58181" ±  0.003   m
LON: -122° 26' 53.06282" ±   0.005   m
ELL HT: -26.732 ±   0.016   m
X: -2700485.062 ±   0.004  m
Y: -4247402.257 ±   0.015  m
Z: 3904421.131 ±   0.007  m
ORTHO HT: 5.496 ±  0.052   m
UTM  10 SPC  403(CA 3)
NORTHING: 4204682.193m 666976.783m
EASTING: 548465.468m 1828892.238m
CONVERGENCE: 0.33971946° -1.19267271°
POINT SCALE: 0.99962893 0.99993774
COMBINED FACTOR: 0.99963312 0.99994193
CONTRIBUTED BY
stephen.randall
NOAA, National Geodetic Survey
Horizon View
The numerical values for this position solution have satisfied the quality control criteria of the National Geodetic Survey. The contributor has verified that the information submitted is accurate and complete.