                          US ARMY CORPS OF ENGINEERS


                                PROJECT REPORT


                          IPAN USACE CLQT - GGN 2455


                                   L12345  

                        JOHN Q PUBLIC - CHIEF OF PARTY

                       FIRST ORDER, CLASS TWO LEVELING

                           09/04/2007 TO 09/07/2007






    A.  Location

         This project is located at south end on the island of Guam at
         IPAN beach

    B.   Scope

         1.   Purpose

              To level the Corps of Engineers shore protection wall at IPAN beach.

         2.   Specifications

              First order class two specifications were followed during the
              execution of this of this project.

         3.   Monumentation

              All monuments were set in the concrete wall and are
              standard USACE bench marks

         B.   Instrumentation

              The following electronic levels were used on this project:

              Make            Model       Serial
              ------------------------------------
              LEICA            DNA03        334391  

              The following rods were used on this project:

              Make            Model       Serial
              ------------------------------------
              LEICA            INVAR        30847   
              LEICA            INVAR        30850   

              Copies of rod calibration will be transmitted with this project


    C.   Comments

         1.   Reconnaissance

              Reconnaissance was done on May 15,20xx and the flolowing
              bench marks were found in good condition:
               CLQT
              GGN 2455
              GGN 2669

         2.   Deviation from specifications

              No deviation from specifications was made.
              

         3.   Routes

              Leveled on the road from CLQT to GGN2455. The terrain was a
              slight hill.
              

         4.   Problems


         5.   Recommendations

               None
              

         6.   Software used

              Windesc for writing the descritions, Translev for the
              processing of leveling data
              

    D.   Statistics


         1.   Monuments recovered, set, and km of leveling

              IPAN USACE CLQT - GGN 2455
              Total No. Runnings:    9
              Total Distance (km):   4.41
              Avg Running Dist (km): 0.49
              Avg Sight Dist (m):    32.4
              Total Time (Hr.):      5.1
              Total Time (Days):     2
              Setups/Hour:           13
              Kilometers/Hour:       0.87
              Kilometers/Day:        2.2
               
              

         2.   Closures

              Line   Misclosure
               
              

         3.   Check measurements


                          IPAN USACE CLQT - GGN 2455
                                       
                                   L12345/
                               ORDER 1 CLASS 2

------------------------- NEW MINUS OLD COMPARISON ---------------------------


SSN  PID    MARK DESIGNATION -DIST- ---NEW---- ---OLD---- DIF (MM) ALLOWABLE

0101 DH2964 CLQT                       7.42500    7.4250     0.00
                              1.089    4.94356    4.9400     3.56    4.17
0102 DH3040 GGN 2669                  12.36856   12.3650     3.56
                              0.663    0.09909    0.1000    -0.91    3.26
0105 DH3028 GGN 2455                  12.46765   12.4650     2.65

            Mean difference                                  2.07


              

         4.   Progress

              (Describe the general progress of the project)
              

         5.   Reruns

              (Describe any sections that needed to rerun and reason for it)
              

    E.   Status


         1.   Records

              (Describe the format of the data and where it will be keep)
              

         2.   Contact

              Should any questions arise concerning the project please contact
               
              (Name and phone number of contact person if problems are
              encountered with the data)
              