COOPER RIVER BRIDGES PROJECT
CHARLESTON, SOUTH CAROLINA

Project Report

National Geodetic Survey
Instrumentation & Methodologies Branch
Corbin, Virginia

March 3, 1999

Report by:
Orland W.Murray, Geodetic Technician
William J. Rindal, Geodetic Technician

A. Location

Charleston, South Carolina at, on and in the vicinity of the Grace Memorial Bridge and the Silas Pearlman Bridge over the Cooper River (U.S. Highway 17).
 

B. Scope

1. Purpose.

This project was a joint efort by the National Ocean Service's Oceanographic Products and Services Division (OPSD), the Coast Survey, and the National Geodetic Survey's (NGS) Instrumentation & Methodologies Branch (I&M Branch) in accordance with NOAA's goal to Promote Safe Navigation and the Physical Oceanographic Real-Time System (PORTS). The objective is to develop a real-time system using GPS to determine the maximum height of a vessel at the lowest point of a bridge. Two bridges over the Cooper River in Charleston, S.C., the Grace Memorial and Silas Pearlman, are the subject of this project.

The task of the I&M Branch was to determine the physical height of the bottom of the bridges below three GPS antennas (two on the Silas Pearlman bridge and one on the Grace Memorial bridge) and determine orthometric heights (elevations) of the antennas and various points (profiles) along the bottom of the bridges to a minimum of 150 feet out on both sides of the centerline of the bridges over the shipping channel. Accomplishment of these tasks was to be done employing special trigonometric leveling techniques developed by the I&M Branch.

2. Specifications.

To determined height differences and elevations to a 2 centimeter or less accuracy.

3. Monumentation.

A new bench mark was set on each of the bridges to serve as a starting reference for future surveys should they occur. These stations were SILAS 1999 on the Silas Pearlman bridge and GRACE 1999 on the Grace Memorial bridge. Each was set in the bridge highway curb near the centerline below the GPS antenna reference points (ARP).

The GPS antenna references points on the Silas Pearlman bridge consisted of aluminum angle brackets bolted to safety railing uprights at the top of the bridge. One on the north side and one on the south side of the bridge. These should be considered semi-permanent. The ARP on the Grace Memorial bridge consisted of a special tribrach with 3 magnetic feet. This was mounted on a horizontal gusset plate at the top of the bridge and secured with tie down cables. This should also be considered semi-permanent.

Recoverable temporary points were established on both bridges. These were SILAS TP1 and GRACE TP1 and were described and marked but not monumented. Both were the top of flat sturdy metal railings that allowed easy attachment of a trig-leveling target mounted on a three inch magnet base.

Non-recoverable temporary points were created to transfer heights to the bottom of the bridges at the centerlines and along the tops of the beams at the bottom of the bridges for the profile observations.

4. Instrumentation. (See Equipment List - ATTACHMENT C)

Primary instrumentation was a Leica TC2002 Total Station providing high accuracy in horizontal (0.5"), vertical (0.5"), and distance measurements (+\-1 mm + 1 ppm). Other equipment used with it were various retro-prism targets, target supports, and range poles. These various components of equipment were tested and calibrated prior to the project.

C. Comments

1. Reconnaissance and Planning

A special reconnaissance trip was taken to Charleston a month earlier than the project to determine location of the GPS antennas, recover local horizontal and vertical control stations, and determine how the heights of the bottom of the bridges might be measured.

After study and evaluation of the information and pictures gathered from the reconnaissance trip, several methods for measuring the height difference between the GPS antennas mounted on top of the bridges and the bottom of the bridges were tested at the I&M Branch facility in Corbin, Va.

The methods tested consisted of trigonometric leveling, remote height measurments, vertical electronic distance measurements (EDMI), and vertical taping. Trig leveling appeared to the most expedient method followed by remote height measurements (a variation of trig-leveling where the distance is measured to a point below the unknown height point), and finally vertical EDMI distances. The last two methods would require a way to collimate directly below the GPS antenna locations. At the time of the tests, it was not known if this would be possible. Vertical taping was a last resort method if none of the others were possible. The only significant unknown affecting the methods involving the use of the total station instrument was the effects from vibration and movement of the bridges due to traffic.

2. Specifications and Procedures.

The first day on the Silas Pearlman bridge an experiment was conducted to test the leveling compensators of the total station. The results were very close with this function turned on and off. However, with it on, the constant traffic induced vibration made the spreads large in the difference of elevation measurements. The compensators were turn off and the instrument kept level manually. A little time was lost at each setup, but otherwise this worked ok. With this problem resolved, the measurements could be started.

Height Differences Using Trig-leveling

Height differences using trigonometric leveling is accomplished by measuring a zenith distance angle and a slope distance to a target forming a right triangle. The base of the triangle is through the vertical center of rotation of the total station instrument (TSI). The slope distance is the hypotenuse and 90 degrees minus the zenith distance is the angle at the intersection of the base and hypotenuse. Given these values, the length of the opposite side of the right triangle can be solved for yielding the height difference between the target and the vertical center of rotation of the TSI. Calculation of the height difference is performed by on-board software stored in the instrument and the value is shown in one of the LCD display windows. It can also be recorded to an on-board data storage recording module. Previous testing of this function has proven its validity when compared to computing the height outside the instrument.

Corrections Applied to Trig-leveling

Prior to observing the measurements, both meteorological data (air temperature and pressure) and instrument and prism offset constants values must be stored into the instrument. The met data is used to compute the refractive index correction of the atmosphere for the EDMI being used. The instrument and prism offset constants were determined by calibration prior to the project. These values are stored in the TSI as a parts per million (PPM) correction from the met data and a combined offset constant (in millimeters) for the EDMI and retro-prism being used.

Also, a standard correction for curvature and refraction is applied to each height difference measurement based on the following formula:

Height Difference = (SD*COS(ZD))+(1-k/2R)*(SD*SIN(ZD))2
where: k = 0.13 (mean value for coefficient of refraction) R = 6.37*10E6 meters (earth radius), SD = measured Slope Distance , ZD = measured Zenith Distance

This correction is also performed by the TSI's on-board software.

Height Difference Determination

The height difference or difference of elevation (d.e.) between two points is obtained by first measuring to a backsight (BS) target which gives the d.e. from the target to TSI. Next, a measurement is taken to a foresight (FS) target which gives the d.e. from the target to the TSI. The foresight d.e. minus the backsight d.e. yields the height difference with the correct sign between the two targets. The relationship of the target to the point to which the height difference is to be established must be considered and appropriate corrections made. In most cases, if both the BS and FS targets are of equal height above the respective points, then the resulting d.e. between the targets is the d.e. between the two points. In other cases, as in this project, corrections for the physical height of the target above or below a reference point must be applied. Figure #1 in ATTACHMENT A illustrates how the height difference from the GPS antennas on top of the Silas Pearlman bridge to reference point Silas TP1 was determined for this project. This case required corrections for both of the targets. Figures #2 and #3 in ATTACHMENT A illustrate the more common scenario where both targets are of equal height above the elevation points. This method was used to measure the height difference from the GPS antenna on top of the Grace Memorial bridge to the Grace TP1 reference point. Figure #3 depicts how the height differences were transferred to the bottom of the bridges at the centerlines and for the profiles.

For all of the height transfers from the antennas down to the bottom of the bridges, multiple measurements from 5 to 10 or more were taken in both direct and reverse positions of the TSI. The average of these was used as the final difference of elevation. For the profile measurements, a minimum of two sets (1 set = direct/reverse on each target) were taken.

Elevation Ties to Local Vertical Control

Once the height differences on the bridges were established double run trig-leveling was run from BM R16 to BM Y151 to reference mark SILAS 1999, and finally to BM X151. Elevations were transferred to the Grace Memorial Bridge through BMs Silas 1999 to Silas TP1 to Grace TP1 using trig-leveling. Observations were made from each bridge to the other on two different days.
 

D. Closures and Field Checks

1. Blunder checks

These measurements were by no means very precise but provided an in the ball park check on the trig-leveling measurements.

a. Silas Pearlman Bridge

The height from SILW ARP (Silas West Antenna Reference Point) to Silas TP1 was measured with a tape. This was not a perfectly vertical measurement, but close. A reasonablely good check was made.

Taped height ....: -45.8 ft.
Trig-level height: -45.7 ft.

Difference: 0.1 ft. (1.2 inches)

b. Grace Memorial Bridge

Prior to this project the South Carolina Dept. of Transportation (SCDOT) measured the height of the Grace Memorial bridge at the centerline upright of the bridge (midspan at U22 L22 chord to chord). The trig-leveling height measured was from the top edge of the horizontal gusset plate on which the antenna was mounted to the bottom edge of the horizontal gusset plate at the bottom of the bridge. SCDOT did not show us exactly where they measured from and to and we forgot to have them show us. The difference is larger than hoped for.

Trig-levels height: -63.96 ft
SCDOT taped height: -63.55 ft

Difference: 0.41 ft (4.92 inches)

2. Leveling Closures

A line tie was made from several bench marks to the east of the bridges and through several bench marks at the east end of the bridges. Double Run Trig-leveling was used from BM R16 (east end of Grace Memorial bridge) to Y151 (east end of Silas Pearlman bridge) to Silas 1999 (on Silas Pearlman bridge) to X151 (also on Silas Pearlman bridge). A new minus old comparison was done between previous First Order leveling (1979) and the current trig-leveling. Since Silas 1999 was new mark between Y151 and X151, the difference of elevation (d.e.) between Y151 and X151 was computed using the sum of the d.e. from Y151 to Silas 1999 and the d.e. from Silas 1999 to X151.

R16 to Y151
Published NAVD88 elevation R16 .... = 3.1810 m
Published NAVD88 elevation Y151 ... = 8.3473 m
Difference of elevation ........... = 5.1663 m

R16 to Y151 trig observed d.e. .... = 5.1661 m
R16 to Y151 published NAVD88 d.e... = 5.1663 m
New-Old. = -0.0002 m

Y151 to X151
Published NAVD88 Elevation X151 ... = 42.6961 m
Published NAVD88 Elevation Y151 ... = 8.3473 m
Difference of elevation ........... = 34.3488 m

Y151 to Silas 1999 trig observed... = 41.0962 m
Silas 1999 to X151 trig observed... = -6.7459 m
Y151 to X151 trig-leveling observed = 34.3503 m
Y151 to X151 published NAVD88 d.e.. = 34.3488 m
New-Old = 0.0015 m

3. Summary of Individual Height Measurements (See sketches in Attachment B showing location of points)
a. Silas Pearlman Bridge
SILE ARP to Silas TP1
Silas TP1 to SILE CL
SILW ARP to Silas TP1
Silas TP1 to SILW CL
Silas TP1 to Silas 1999
Silas 1999 to Profile Points 1-16
Silas TP1 to Grace TP1

b. Grace Memorial Bridge
Grace TP1 to Silas TP1
GRAC ARP to Grace TP1
Grace TP1 to Grace CL
Grace TP1 to Grace 1999
Grace 1999 to Profile Points 1-10

c. Leveling Ties (Double-Run Trig-Levels)
R16 to Y151
Y151 to Silas 1999
Silas 1999 to X151
 

E. Recommendations

Despite the constraints of limited time and persistent traffic on the bridges, the results of this project are very good. It appears that heights and elevations determined using trig-leveling techniques fall within about a centimeter or less. This is well within the 2 centimeters desired. All objectives were met.

1. Determine the physical height of the bottom of the bridges below three GPS antennas.
2. Determine orthometric heights (elevations) of the antennas and various points (profiles) along the bottom of the bridges to a minimum of 150 feet out on both sides of the centerline.

For similar future projects, the use of trig-leveling techniques should provide a viable means for height transfers if the following procedures are adhered to.

1. Use a total station instrument (TSI) with at least a 1 second or better angulation capability and an electronic distance measuring accuracy of +/- 3 mm + 2 ppm or better.
2. Be sure all parameters and corrections are dialed into the TSI correctly (i.e. temperature, pressure, offset constant corrections, and refraction/curvature correction on).
3. Keep height transfer sight lengths as short as possible (50 meters or less) and angle to upper target 45 degrees or less if possible.
4. Keep TSI as level as possible. Monitor instrument level often. In most cases, if bridge is shaky, it will not be possible to use TSI electronic leveling compensation.
5. Take 5 or more sets (1 set = 1 direct/reverse pointing) on each backsight and foresight targets.
6. Take two independent sets of measurements. Measure one set of 5, BS/FS, then reset the instrument and take another set of 5. This will constitute a forward and backward running providing some redundancy.
7. Keep good notes and sketches on target placement, heights above references points, reflector constants, for application to post observation computations.
8. If profiling bottom of bridge, double run between all points and carefully determine distance from centerline to each profile point.


Other Recommendations

It is not necessary to make a direct height measurement between two points of interest. Temporary points can be used as in the case of this project. To determine the height difference from the antenna reference points to the bottom of the bridge, four measurements had to be taken. SILE ARP to SILAS TP1, SILAS TP1 to SILAS 1999, SILAS 1999 to Top of the Beam, and finally the thickness of the beam (See Attachment B Figure #3). The sum of these, after applying corrections, yields the final height difference. Choose temporary points that can be remeasured and are stable.

Stability is a key component of good survey measurements. In most normal environments, stability of the instrument platform is achieved. However, when working on bridges carrying traffic, movement of the bridges is inevitable and natural to the bridge design. So, if it is possible to set up on a stable platform (a pier, an island, another bridge) nearby, do so and make height transfers from there. Of course, the points of interest on the bridge must be visible from there.

Data collection for this project could have been better implemented. Although trig-leveling software had been previously developed, it needed modification to be applied to this projects specifications. The I&M Branch will address this for future application. This was not a major problem given that there was a small amount of data.
 

TABULATED ELEVATIONS AND HEIGHT DIFFERENCES

Antenna Reference Points to Bottom Centerline of Bridges
 
From Point To Point Height Difference
SPSN Designation Elevation (m) SPSN Designation Elevation(m) Meters Feet
0009 SILE ARP 65.2046 0010 SILE CL 46.5969 -18.6077 -61.0488
0008 SILW ARP 65.2104 0011 SILW CL 46.5903 -18.6201 -61.0894
0013 GRAC ARP 66.9055 0015 GRACE CL 47.3507 -19.5548 -64.1560



Antenna Reference Points to Bottom of Bridge Profile Points (South Side of Silas Pearlman Bridge)
From Point To Point Height Difference
SPSN Designation Elevation (m) SPSN Designation Elevation (m) Meters Feet
0009 SILE ARP 65.2046 0020 SILAS PF5 46.2159 -18.989 -62.300
0021 SILAS PF6 46.4376 -18.767 -61.571
0022 SILAS PF7 46.5052 -18.699 -61.348
0023 SILAS PF8 46.5941 -18.611 -61.050
0010 SILE CL 46.5969 -18.608 -61.049
0031 SILAS PF16 46.5900 -18.615 -61.073
0030 SILAS PF15 46.5761 -18.629 -61.119
0029 SILAS PF14 46.4372 -18.767 -61.571
0028 SILAS PF13 46.2126 -18.992 -62.310

Antenna Reference Points to Bottom of Bridge Profile Points (North Side of Silas Pearlman Bridge)
From Point To Point Height Difference
SPSN Designation Elevation (m)  SPSN Designation Elevation (m) Meters Feet
0008 SILW ARP 65.2104 0019 SILAS PF4 46.2123 -18.998 -62.329
0018 SILAS PF3 46.3293 -18.881 -61.945
0017 SILAS PF2 46.4935 -18.717 -61.407
0016 SILAS PF1 46.5563 -18.654 -61.201
0011 SILW CL 46.5903 -18.620 -61.089
0024 SILAS PF9 46.5880 -18.622 -61.096
0025 SILAS PF10 46.4995 -18.711 -61.388
0026 SILAS PF11 46.4295 -18.781 -61.617
0027 SILAS PF12 46.2096 -19.001 -62.339

Antenna Reference Points to Bottom of Bridge Profile Points (North Side of Grace Memorial Bridge)
From Point To Point Height Difference
SPSN Designation Elevation (m) SPSN Designation Elevation (m) Meters Feet
0013 GRAC ARP 66.9055 0041 GRACE PF10 42.4869 -24.419 -80.113
0040 GRACE PF9 43.8047 -23.101 -75.790
0039 GRACE PF8 45.1317 -21.774 -71.436
0038 GRACE PF7 46.3189 -20.587 -67.541
0037 GRACE PF6 47.1003 -19.805 -64.978
0015 GRACE CL 47.3507 -19.555 -64.157
0032 GRACE PF1 47.3552 -19.550 -64.141
0033 GRACE PF2 46.8308 -20.075 -65.862
0034 GRACE PF3 45.7661 -21.139 -69.355
0035 GRACE PF4 44.4580 -22.448 -73.647
0036 GRACE PF5 43.1436 -23.762 -77.959

ATTACHMENT A

Trigonometric Leveling
Height Measurement Diagrams




 

ATTACHMENT B

Project Sketches
Height Diagrams
Profile Diagrams




ATTACHMENT C

Equipment List

Equipment List for Charleston Bridge Project

1 TC2002 Total Station Sn:359817 NOAA:529697
4 Instrument Batteries GEB64
1 Battery Saver 3 Quick Charger and adaptors
1 Standard Leica battery charger for both TC2002 and NA3003 batteries
1 GTS-700 Total Station Sn:KE0136 NOAA:529647 Battery Charger in case
1 GTS-700 Battery extra
1 Laptop Computor Sn:5021 NOAA:493813 Mod#: 48431
1 Metal Scale 300 mm
1 Thermistor temperature probe and display unit
2 Tribrachs
5 Tribrach Adaptors
1 Alti-plus digital barometer
1 Psychrometer
1 NA3003 Digital Level Sn:92430 NOAA:529526
2 Leveling Rod 3-meter invar bar-coded
Sn:27236 NOAA:529636
Sn:27229 NOAA:529635
1 60 CM invar strip
1 Small Kern Collimator
2 Trig Leveling Targets
2 GPS magnetic antenna mounts (Dave Crump's) Note: Height to top of yellow surface 61.0 mm
2 SECO Trig-leveling poles
Various adaptors for targets (bayonets, 5/8x11 adaptors)
2 Two meter GPS poles
Range pole sets (2-15 ft and parts, 1ft , 2 ft, Seco 5 m adjustable,bubbles, braces and clamps)
4 Peanut prism targets (0 or -30.0 mm constants)
2 Tapes 30 meter (standardized and non)
Various mounting magnets (big and little)
6 Radios (two-way walkie talkie)
CBL#3 Sn : 651ARU0210
CBL#2 Sn : 65IARU0209
Corbin Sn: 651ARU0212
Corbin Sn: 651ARU0213 Corbin Sn: 651ARU0214
Corbin Sn: 651ARU0215
4 Radio chargers
1 Umbrella
Rope and haulup bag
Various Tools (hammer, chisels, wrenches, C-clamps, tie straps,etc.)
Mark and mark setting material (epoxy)
Various angle iron pieces to mount targets
1 Slip-leg Tripod
1 T-3 Fixed leg
1 Level tripod fixed leg
Recording forms and field books
Bridge Diagrams and notes
1 HP-41 Calculator
1 HP-200LX handheld computer
Duct tape
Standard batteries (D, C, AA etc. )
Cameras
Safety Vests
Binoculars
Flashlights
2 Tripod Holders
2 Leveling turning pins and hammer
2 12 volt Flashing Warning Lights