|
|
Wetlands Restoration: Poplar Point Marsh |
|
|
The field work began with a differential leveling survey to transfer
historic tidal elevations from nearby tidal bench marks located at the
Washington Navy Yard. To save time and maximize accuracy, a creative short-cut
was found under the river via the Anacostia subway tunnel. A static GPS
survey added accuate horizontal positions and ellipsoid heights to the
new bench marks, and provided control for a kinematic survey of monitoring
wells and the marsh surface.
| PROJECT PHASE | Photos | Plots | Station Lists | Instructions |
| Leveling | thumbnails
slide show |
plot | Prelim Results
Final Adjusted Elevations |
Instructions |
| Static GPS | thumbnails
slide show |
Prelim Free Adjustment
Final Free Adjustment |
Instructions | |
| Kinematic GPS | thumbnails
slide show |
plot, wireframe
contours, 2, 3, 4 profile, 2 |
kinematic positions | |
| Aerial Photography | aerial | |||
| Monitoring wells | Misc. | plot, 2 | prelim positions |
| Last updated by Joe.Evjen on Monday, 24-Nov-2003 14:38:46 EST |
|---|