8
HEIGHT SYSTEMS
FIVE STEPS TO CREATING A VERTICAL CONTROL NETWORK
›
›Recon level line and set new bench marks
›
›Observe height differences between bench marks
›
›Correct observations for known systematic effects
›
›Minimize discrepancies in the results obtained by leveling along different routes between the same two points
›
›Define the surface datum to which heights may be referred
›