GUIDELINES
Run Vertical Constrained Adjustment
- Add Geoid Heights
- Fix 1 position, all published orthometric heights
- Evaluate residuals for consistency with control (Readjust Orthometric Heights?)
-
Run Free Adjustment to compute accuracies
- Fix 1 position and 1 ellipsoid height
- Determine if accuracies meet requirements (Readjust Positions?)