Standards and
Federal Geodetic Control Committee |
MEMBER ORGANIZATIONS
Department of Commerce
Department of Agriculture
Defense Mapping Agency
Corps of Engineers, US Army
Department of Energy
Department of Housing and Urban Development
Department of the Interior
Department of Transportation
National Aeronautics and Space Administration
Tennessee Valley Authority
Federal Emergency Management Agency
FGCC
Standards and Specifications
for Geodetic Control Networks
Federal Geodetic Control Committee
John D. Bossler, Chairman
September 1984
For information write:
Chairman Federal Geodetic Control Committee
6001 Executive Boulevard
Rockville, Maryland 20852
For sale by the National Geodetic Information Branch (N/CG17x2), NOAA, Rockville, MD 20852
United States. Federal Geodetic Control Committee.
Standard and specifications for geodetic control networks.
Replaces both "Classification, standards of accuracy, and general specifications of geodetic control surveys," issued February 1974 and "Specifications to support classification, standards of accuracy, and general specifications of geodetic control surveys," revised June 1980 Pref.
"September 1984."
1. Geodesy-Standards-United States. I. Bossler, John D. II. Title.
QB296.U89U5 1984 526.3'3 84-600257
This single publication is designed to replace both "Classification, Standards of Accuracy and General Specifications of Geodetic Control Surveys," issued February 1974, and "Specifications to Support Classification, Standards of Accuracy, and General Specifications of Geodetic Control Surveys," issued June 1980. Because requirements and methods for acquisition of geodetic control are changing rapidly, this publication is being released in loose-leaf format so that it can be updated more conveniently and efficiently. Recipients of this publication wishing to receive updated information should complete and mail the form below. Comments on the contents and format of the publication are welcomed and should be addressed to:
FGCC Secretariat, Code N/CG1x5
National Geodetic Survey, NOAA
Rockville, Maryland20852
(Detach and mail to: National Geodetic Information Branch, code N/CG174, NOAA,
Rockville, Maryland 20852)
Please inform me of updated information for "Standards and Specifications for
Geodetic Control Networks."
Name:
Address:
□ Check here if address given is a private residence.
(signature)
(date)
| Preface | |
| 1. | Introduction |
| 2. | Standards |
| 2.1 | Horizontal control network standards |
| 2.2 | Vertical control network standards |
| 2.3 | Gravity control network standards |
| 3. | Specifications |
| 3.1 | Introduction |
| 3.2 | Triangulation |
| 3.3 | Traverse |
| 3.4 | Inertial surveying |
| 3.5 | Geodetic leveling |
| 3.6 | Photogrammetry |
| 3.7 | Satellite Doppler positioning |
| 3.8 | Absolute gravimetry |
| 3.9 | Relative gravimetry |
| 4. | Information |
| 5. | References |
| Appendix A. | Governmental authority |
| A.1 | Authority |
| A.2 | References |
| Appendix B. | Variance factor estimation |
| B.1 | Introduction |
| B.2 | Global variance factor estimation |
| B.3 | Local variance factor estimation |
| B.4 | Iterated almost unbiased estimation |
| B.5 | References |
| Appendix C. | Procedures for submitting data to the National Geodetic Survey |
The Government of the United States makes nationwide surveys, maps, and charts of various kinds. These are necessary to support the conduct of public business at all levels of government, for planning and carrying out national and local projects, the development and utilization of natural resources, national defense, land management, and monitoring crustal motion. Requirements for geodetic control surveys are most critical where intense development is taking place, particularly offshore areas, where surveys are used in the exploration and development of natural resources, and in delineation of state and international boundaries.
State and local governments and industry regularly cooperate in various parts of the total surveying and mapping program. In surveying and mapping large areas, it is first necessary to establish frameworks of horizontal, vertical, and gravity control. These provide a common basis for all surveying and mapping operations to ensure a coherent product. A reference system, or datum, is the set of numerical quantities that serves as a common basis. Three National Geodetic Control Networks have been created by the Government to provide the datums. It is the responsibility of the National Geodetic Survey (NGS) to actively maintain the National Geodetic Control Networks (appendix A).
These control networks consist of stable, identifiable points tied together by extremely accurate observations. From these observations, datum values (coordinates or gravity) are computed and published. These datum values provide the common basis that is so important to surveying and mapping activities.
As stated, the United States maintains three control networks. A horizontal network provides geodetic latitudes and longitudes in the North American Datum reference system; a vertical network furnishes elevations in the National Geodetic Vertical Datum reference system; and a gravity network supplies gravity values in the U.S. absolute gravity reference system. A given station may be a control point in one, two, or all three control networks.
It is not feasible for all points in the control networks to be of the highest possible accuracy. Different levels of accuracy are referred to as the "order" of a point. Orders are often subdivided further by a "class" designation. Datum values for a station are assigned an order (and class) based upon the appropriate classification standard for each of the three control networks. Horizontal and vertical standards are defined in reasonable conformance with past practice. The recent development of highly accurate absolute gravity instrumentation now allows a gravity reference standard. In the section on "Standards," the classification standards for each of the control networks are described, sample computations performed, and monumentation requirements given.
Control networks can be produced only by making very accurate measurements which are referred to identifiable control points. The combination of survey design, instrumentation, calibration procedures, observational techniques, and data reduction methods is known as a measurement system. The section on "Specifications" describes important components and states permissible tolerances for a variety of measurement systems.
Clearly, the control networks would be of little use if the datum values were not published. The section entitled "Information" describes the various products and formats of available geodetic data.
Upon request, the National Geodetic Survey will accept data submitted in the correct formats with the proper supporting documentation (appendix C) for incorporation into the national networks. When a survey is submitted for inclusion into the national networks, the survey measurements are processed in a quality control procedure that leads to their classification of accuracy and storage in the National Geodetic Survey data base. To fully explain the process we shall trace a survey from the planning stage to admission into the data base. This example will provide an overview of the standards and specifications, and how they work together.
The user should first compare the distribution and accuracy of current geodetic control with both immediate and long-term needs. From this basis, requirements for the extent and accuracy of the planned survey are determined. The classification standards of the control networks will help in this formulation. Hereafter, the requirements for the accuracy of the planned survey will be referred to as the "intended accuracy" of the survey. A measurement system is then chosen, based on various factors such as: distribution and accuracy of present control; region of the country; extent, distribution, and accuracy of the desired control; terrain and accessibility of control; and economic factors.
Upon selection of the measurement system, a survey design can be started. The design will be strongly dependent upon the "Network Geometry" specifications for that measurement system. Of particular importance is the requirement to connect to previously established control points. If this is not done, then the survey cannot be placed on the national datum. An adequate number of existing control point connections are often required in the specifications in order to ensure strong network geometry for other users of the control, and to provide several closure checks to help measure accuracy. NGS can certify the results of a survey only if it is connected to the national network.
Situations will arise where one cannot, or prefers not to, conform to the specifications. NGS may downgrade the classification of a survey based upon failure to adhere to the measurement system specifications if the departure degrades the precision, accuracy, or utility of the survey. On the other hand, if specification requirements for the desired level of accuracy are exceeded, it may be possible to upgrade a survey to a higher classification.
Depending upon circumstances, one may wish to go into the field to recover old control and perform reconnaissance and site inspection for the new survey. Monumentation may be performed at this stage. Instruments should be checked to conform to the "Instrumentation" specifications, and to meet the "Calibration Procedures" specifications. Frequent calibration is an excellent method to help ensure accurate surveys.
In the field, the "Field Procedures" specifications are used to guide the methods for taking survey measurements. It must be stressed that the "Field Procedures" section is not an exhaustive account of how to perform observations. Reference should be made also to the appropriate manuals of observation methods and instruments.
Computational checks can be found in the "Field Procedures" as well as in the "Office Procedures" specifications, since one will probably want to perform some of the computations in the field to detect blunders. It is not necessary for the user to do the computations described in the "Office Procedures" specifications, since they will be done by NGS. However, it is certainly in the interest of the user to compute these checks before leaving the field, in case reobservations are necessary. With the tremendous increase in programmable calculator and small computer technology, any of the computations in the "Office Procedures" specifications could be done with ease in the field.
At this point the survey measurements have been collected, together with the new description and recovery notes of the stations in the new survey. They are then placed into the formats specified in the Federal Geodetic Control Committee (FGCC) publicationsInput Formats and Specifications of the National Geodetic Survey Data Base. Further details of this process can be found in appendix C, "Procedures for Submitting Data to the National Geodetic Survey."
The data and supporting documentation, after being received at NGS, are processed through a quality control procedure to make sure that all users may place confidence in the new survey points. First, the data and documentation are examined for compliance with the measurement system specifications for the intended accuracy of the new survey. Then office computations are performed, including a minimally constrained least squares adjustment. (See appendix B for details.) From this adjustment, accuracy measures can be computed by error propagation. The accuracy classification thus computed is called the "provisional accuracy" of the survey.
The provisional accuracy is compared to the intended accuracy. The difference indicates the departure of the accuracy of the survey from the specifications. If the difference is small, the intended accuracy has precedence because a possible shift in classification is not warranted. However, if the difference is substantial, the provisional accuracy will supersede the intended accuracy, either as a downgrade or an upgrade.
As the final step in the quality control procedure, the variance factor ratio computation using established control, as explained in the section on "Standards," is determined for the new survey. If this result meets the criteria stated there, then the survey is classified in accordance with the provisional accuracy (or intended accuracy, whichever has precedence).
Cases arise where the variance factor ratio is significantly larger than expected. Then the control network is at fault, or the new survey is subject to some unmodeled error source which degrades its accuracy. Both the established control measurements and the new survey measurements will be scrutinized by NGS to determine the source of the problem. In difficult cases, NGS may make diagnostic measurements in the field.
Upon completion of the quality control check, the survey measurements and datum values are placed into the data base. They become immediately available for electronic retrieval, and will be distributed in the next publication cycle by the National Geodetic Information Branch of NGS.
A final remark bears on the relationship between the classification standards and measurement system specifications. Specifications are combinations of rules of thumb and studies of error propagation, based upon experience, of how to best achieve a desired level of quality. Unfortunately, there is no guarantee that a particular standard will be met if the associated specifications are followed. However, the situation is ameliorated by a safety factor of two incorporated in the standards and specifications. Because of this safety factor, it is possible that one may fail to meet the specifications and still satisfy the desired standard. This is why the geodetic control is not automatically downgraded when one does not adhere to the specifications. Slight departures from the specifications can be accommodated. In practice, one should always strive to meet the measurement system specifications when extending a National Geodetic Control Network.
The classification standards of the National Geodetic Control Networks are based on accuracy. This means that when control points in a particular survey are classified, they are certified as having datum values consistent with all other points in the network, not merely those within that particular survey. It is not observation closures within a survey which are used to classify control points, but the ability of that survey to duplicate already established control values. This comparison takes into account models of crustal motion, refraction, and any other systematic effects known to influence the survey measurements.
The NGS procedure leading to classification covers four steps:
1. The survey measurements, field records, sketches, and other documentation are examined to verify compliance with the specifications for the intended accuracy of the survey. This examination may lead to a modification of the intended accuracy.
2. Results of a minimally constrained least squares adjustment of the survey measurements are examined to ensure correct weighting of the observations and freedom from blunders.
3. Accuracy measures computed by random error propagation determine the provisional accuracy. If the provisional accuracy is substantially different from the intended accuracy of the survey, then the provisional accuracy supersedes the intended accuracy.
4. A variance factor ratio for the new survey combined with network data is computed by the Iterated Almost Unbiased Estimator (IAUE) method (appendix B). If the variance factor ratio is reasonably close to 1.0 (typically less than 1.5), then the survey is considered to check with the network, and the survey is classified with the provisional (or intended) accuracy. If the variance factor ratio is much greater than 1.0 (typically 1.5 or greater), then the survey is considered to not check with the network, and both the survey and network measurements will be scrutinized for the source of the problem.
2.1 Horizontal Control Network Standards
When a horizontal control point is classified with a particular order and class, NGS certifies that the geodetic latitude and longitude of that control point bear a relation of specific accuracy to the coordinates of all other points in the horizontal control network. This relation is expressed as a distance accuracy, 1:a. A distance accuracy is the ratio of the relative positional error of a pair of control points to the horizontal separation of those points.
| Classification | Minimum distance accuracy |
|---|---|
| First-order | 1:100,000 |
| Second-order, class I | 1: 50,000 |
| Second-order, class II | 1: 20,000 |
| Third-order, class I | 1: 10,000 |
| Third-order, class II | 1: 5,000 |
A distance accuracy, l:a, is computed from a minimally constrained, correctly weighted, least squares adjustment by:
a = d/s
where
a = distance accuracy denominator
s = propagated standard deviation of distance between survey points obtained
from the least squares adjustment
d =distance between survey points
The distance accuracy pertains to all pairs of points (but in practice is computed for a sampling of pairs of points). The worst distance accuracy (smallest denominator) is taken as the provisional accuracy. If this is substantially larger or smaller than the intended accuracy, then the provisional accuracy takes precedence.
As a test for systematic errors, the variance factor ratio of the new survey is computed by the Iterated Almost Unbiased Estimator (IAUE) method described in appendix B. This computation combines the new survey measurements with existing network data, which are assumed to be correctly weighted and free of systematic error. If the variance factor ratio is substantially greater than unity then the survey does not check with the network, and both the survey and the network data will be examined by NGS.
Computer simulations performed by NGS have shown that a variance factor ratio greater than 1.5 typically indicates systematic errors between the survey and the network. Setting a cutoff value higher than this could allow undetected systematic error to propagate into the national network. On the other hand, a higher cutoff value might be considered if the survey has only a small number of connections to the network, because this circumstance would tend to increase the variance factor ratio.
In some situations, a survey has been designed in which different sections provide different orders of control. For these multi-order surveys, the computed distance accuracy denominators should be grouped into sets appropriate to the different parts of the survey. Then, the smallest value of a in each set is used to classify the control points of that portion, as discussed above. If there are sufficient connections to the network, several variance factor ratios, one for each section of the survey, should be computed.
Horizontal Example
Suppose a survey with an intended accuracy of first-order (1:100,000) has been
performed. A series of propagated distance accuracies from a minimally constrained
adjustment is now computed.
| Line | s (m) | d (m) | 1:a |
|---|---|---|---|
| l-2 | 0.141 | 17,107 | 1:121,326 |
| l-3 | 0.170 | 20,123 | 1:118,371 |
| 2-3 | 0.164 | 15,505 | 1: 94,543 |
Suppose that the worst distance accuracy is 1:94,543. This is not substantially different from the intended accuracy of 1:100,000, which would therefore have precedence for classification. It is not feasible to precisely quantify "substantially different." Judgment and experience are determining factors.
Now assume that a solution combining survey and network data has been obtained (as per appendix B), and that a variance factor ratio of 1.2 was computed for the survey. This would be reasonably close to unity, and would indicate that the survey checks with the network. The survey would then be classified as first-order using the intended accuracy of 1:100,000.
However, if a variance factor of, say, 1.9 was computed, the survey would not check with the network. Both the survey and network measurements then would have to be scrutinized to find the problem.
Monumentation
Control points should be part of the National Geodetic Horizontal Network only
if they possess permanence, horizontal stability with respect to the Earth's
crust, and a horizontal location which can be defined as a point. A 30-centimeter-long
wooden stake driven into the ground, for example, would lack both permanence
and horizontal stability. A mountain peak is difficult to define as a point.
Typically, corrosion resistant metal disks set in a large concrete mass have
the necessary qualities. First-order and second-order, class I, control points
should have an underground mark, at least two monumented reference marks at
right angles to one another, and at least one monumented azimuth mark no less
than 400 m from the control point. Replacement of a temporary mark by a more
permanent mark is not acceptable unless the two marks are connected in timely
fashion by survey observations of sufficient accuracy. Detailed information
may be found in C&GSSpecial Publication 247,"Manual of geodetic triangulation."
2.2 Vertical Control Network Standards
When a vertical control point is classified with a particular order and class, NGS certifies that the orthometric elevation at that point bears a relation of specific accuracy to the elevations of all other points in the vertical control network. That relation is expressed as an elevation difference accuracy, b. An elevation difference accuracy is the relative elevation error between a pair of control points that is scaled by the square root of their horizontal separation traced along existing level routes.
| Classification | Maximum elevation difference accuracy |
|---|---|
| First-order, class I | 0.5 |
| First-order, classs II | 0.7 |
| Second-order, class I | 1.0 |
| Second-order, class II | 1.3 |
| Third-order | 2.0 |
An elevation difference accuracy, b, is computed from a minimally constrained, correctly weighted, least squares adjustment by
b = S/√d
where
d = approximate horizontal distance in kilometers between control point positions
traced along existing level routes.
S = propagated standard deviation of elevation difference in millimeters between
survey control points obtained from the least squares adjustment. Note that
the units of b are (mm)/ √ (km).
The elevation difference accuracy pertains to all pairs of points (but in practice is computed for a sample). The worst elevation difference accuracy (largest value) is taken as the provisional accuracy. If this is substantially larger or smaller than the intended accuracy, then the provisional accuracy takes precedence.
As a test for systematic errors, the variance factor ratio of the new survey is computed by the Iterated Almost Unbiased Estimator (IAUE) method described in appendix B. This computation combines the new survey measurements with existing network data, which are assumed to be correctly weighted and free of systematic error. If the variance factor ratio is substantially greater than unity, then the survey does not check with the network, and both the survey and the network data will be examined by NGS.
Computer simulations performed by NGS have shown that a variance factor ratio greater than 1.5 typically indicates systematic errors between the survey and the network. Setting a cutoff value higher than this could allow undetected systematic error to propagate into the national network. On the other hand, a higher cutoff value might be considered if the survey has only a small number of connections to the network, because this circumstance would tend to increase the variance factor ratio.
In some situations, a survey has been designed in which different sections provide different orders of control. For these multi-order surveys, the computed elevation difference accuracies should be grouped into sets appropriate to the different parts of the survey. Then, the largest value of b in each set is used to classify the control points of that portion, as discussed above. If there are sufficient connections to the network, several variance factor ratios, one for each section of the survey, should be computed.
Vertical Example
Suppose a survey with an intended accuracy of second-order, class II has been
performed. A series of propagated elevation difference accuracies from a minimally
constrained adjustment is now computed.
| Line | s | d | b |
|---|---|---|---|
| (mm) | (km) | (mm)/√(km) | |
| l-2 | 1.574 | 1.718 | 1.20 |
| l-3 | 1.743 | 2.321 | 1.14 |
| 2-3 | 2.647 | 4.039 | 1.32 |
Suppose that the worst elevation difference accuracy is 1.32. This is not substantially different from the intended accuracy of 1.3 which would therefore have precedence for classification. It is not feasible to precisely quantify "substantially different." Judgment and experience are determining factors.
Now assume that a solution combining survey and network data has been obtained (as per appendix B), and that a variance factor ratio of 1.2 was computed for the survey. This would be reasonably close to unity and would indicate that the survey checks with the network. The survey would then be classified as second-order, class II, using the intended accuracy of 1.3.
However, if a survey variance factor ratio of, say, 1.9 was computed, the survey would not check with the network. Both the survey and network measurements then would have to be scrutinized to find the problem.
Monumentation
Control points should be part of the National Geodetic Vertical Network only
if they possess permanence, vertical stability with respect to the Earth's crust,
and a vertical location that can be defined as a point. A 30-centimeter- long
wooden stake driven into the ground, for example, would lack both permanence
and vertical stability. A rooftop lacks stability and is difficult to define
as a point. Typically, corrosion resistant metal disks set in large rock outcrops
or long metal rods driven deep into the ground have the necessary qualities.
Replacement of a temporary mark by a more permanent mark is not acceptable unless
the two marks are connected in timely fashion by survey observations of sufficient
accuracy. Detailed information may be found inNOAA Manual NOS NGS 1,"Geodetic
bench marks."
2.3 Gravity Control Network Standards
When a gravity control point is classified with a particular order and class, NGS certifies that the gravity value at that control point possesses a specific accuracy.
Gravity is commonly expressed in units of milligals (mGa1) or microgals (Gal) equal, respectively, to (10-5) meters/sec2, and (10-8) meters/sec2. Classification order refers to measurement accuracies and class to site stability.
| Classification | Gravity accuracy (μGal) |
|---|---|
| First-order, class I | 20 (subject to stability verification) |
| First-order, class II | 20 |
| Second-order | 50 |
| Third-order | 100 |
When a survey establishes only new points, and where only absolute measurements are observed, then each survey point is classified independently. The standard deviation from the mean of measurements observed at that point is corrected by the error budget for noise sources in accordance with the following formula:
c2= Σni+1((xi - xm)2/ (n - 1)) + e2
Where
c =gravity accuracy
xi= gravity measurement
n = number of measurements
xm= ( Σni=1(xi)
/ (n)
e = external random error
The value obtained for c is then compared directly against the gravity accuracy standards table.
When a survey establishes points at which both absolute and relative measurements are made, the absolute determination ordinarily takes precedence and the point is classified accordingly. (However, see Example D below for an exception.)
When a survey establishes points where only relative measurements are observed, and where the survey is tied to the National Geodetic Gravity Network, then the gravity accuracy is identified with the propagated gravity standard deviation from a minimally constrained, correctly weighted, least squares adjustment.
The worst gravity accuracy of all the points in the survey is taken as the provisional accuracy. If the provisional accuracy exceeds the gravity accuracy limit set for the intended survey classification, then the survey is classified using the provisional accuracy.
As a test for systematic errors, the variance factor ratio of the new survey is computed by the Iterated Almost Unbiased Estimator (IAUE) method described in appendix B. This computation combines the new survey measurements with existing network data which are assumed to be correctly weighted and free of systematic error. If the variance factor ratio is substantially greater than unity, then the survey does not check with the network, and both the survey and the network data will be examined by NGS.
Computer simulations performed by NGS have shown that a variance factor ratio greater than 1.5 typically indicates systematic errors between the survey and the network. Setting a cutoff value higher than this could allow undetected systematic error to propagate into the national network. On the other hand, a higher cutoff value might be considered if the survey has only a minimal number of connections to the network, because this circumstance would tend to increase the variance factor ratio.
In some situations, a survey has been designed in which different sections provide different orders of control. For these multi-order surveys, the computed gravity accuracies should be grouped into sets appropriate to the different parts of the survey. Then, the largest value of c in each set is used to classify the control points of that portion, as discussed above. If there are sufficient connections to the network, several variance factor ratios, one for each part of the survey, should be computed.
Gravity Examples
Example A.Suppose a gravity survey using absolute measurement
techniques has been performed. These points are then unrelated. Consider one
of these survey points.
Assume n = 750
Σ750i=1((xi -
xm)2= .169 mGal2
e = 5 μGal
c2= (0.169) / (750 - 1) + (.005)2
c = 16 μGal
The point is then classified as first-order, class II.
Example B.Suppose a relative gravity survey with an intended accuracy of second-order (50 μGal) has been performed. A series of propagated gravity accuracies from a minimally constrained adjustment is now computed.
| Station | Gravity standard deviation (μGal) |
|---|---|
| 1 | 38 |
| 2 | 44 |
| 3 | 55 |
Suppose that the worst gravity accuracy was 55 μGal. This is worse than the intended accuracy of 50 μGal. Therefore, the provisional accuracy of 55 μGal would have precedence for classification, which would be set to third-order.
Now assume that a solution combining survey and network data has been obtained (as per appendix B) and that a variance factor of 1.2 was computed for the survey. This would be reasonably close to unity, and would indicate that the survey checks with the network. The survey would then be classified as third-order using the provisional accuracy of 55 μGal.
However, if a variance factor of, say, 1.9 was computed, the survey would not check with the network. Both the survey and network measurements then would have to be scrutinized to find the problem.
Example C.Suppose a survey consisting of both absolute and relative measurements has been made at the same points. Assume the absolute observation at one of the points yielded a classification of first-order, class II, whereas the relative measurements produced a value to second-order standards. The point in question would be classified as first-order, class II, in accordance with the absolute observation.
Example D.Suppose we have a survey similar to Case C, where the absolute measurements at a particular point yielded a third-order classification due to an unusually noisy observation session, but the relative measurements still satisfied the second-order standard. The point in question would be classified as second-order, in accordance with the relative measurements.
Monumentation
Control points should be part of the National Geodetic Gravity Network only
if they possess permanence, horizontal and vertical stability with respect to
the Earth's crust, and a horizontal and vertical location which can be defined
as a point. For all orders of accuracy, the mark should be imbedded in a stable
platform such as flat, horizontal concrete. For first-order, class I stations,
the platform should be imbedded in stable, hard rock, and checked at least twice
for the first year to ensure stability. For first-order, class II stations,
the platform should be located in an extremely stable environment, such as the
concrete floor of a mature structure. For second and third-order stations, standard
bench mark monumentation is adequate. Replacement of a temporary mark by a more
permanent mark is not acceptable unless the two marks are connected in timely
fashion by survey observations of sufficient accuracy. Detailed information
is given in NOAAManual NOS NGS 1, "Geodetic bench marks." Monuments should
not be near sources of electromagnetic interference.
It is recommended, but not necessary, to monument third-order stations. However, the location associated with the gravity value should be recoverable, based upon the station description.
3.1 Introduction
All measurement systems regardless of their nature have certain common qualities. Because of this, the measurement system specifications follow a prescribed structure as outlined below. These specifications describe the important components and state permissible tolerances used in a general context of accurate surveying methods. The user is cautioned that these specifications are not substitutes for manuals that detail recommended field operations and procedures.
The observations will have spatial or temporal relationships with one another as given in the "Network Geometry" section. In addition, this section specifies the frequency of incorporation of old control into the survey. Computer simulations could be performed instead of following the "Network Geometry" and "Field Procedures" specifications. However, the user should consult the National Geodetic Survey before undertaking such a departure from the specifications
The "Instrumentation" section describes the types and characteristics of the instruments used to make observations. An instrument must be able to attain the precision requirements given in "Field Procedures."
The section "Calibration Procedures" specifies the nature and frequency of instrument calibration. An instrument must be calibrated whenever it has been damaged or repaired.
The "Field Procedures" section specifies particular rules and limits to be met while following an appropriate method of observation. For a detailed account of how to perform observations, the user should consult the appropriate manuals.
Since NGS will perform the computations described under "Office Procedures," it is not necessary for the user to do them. However, these computations provide valuable checks on the survey measurements that could indicate the need for some reobservations. This section specifies commonly applied corrections to observations, and computations which monitor the precision and accuracy of the survey. It also discusses the correctly weighted, minimally constrained least squares adjustment used to ensure that the survey work is free from blunders and able to achieve the intended accuracy. Results of the least squares adjustment are used in the quality control and accuracy classification procedures. The adjustment performed by NGS will use models of error sources, such as crustal motion, when they are judged to be significant to the level of accuracy of the survey.
3.2 Triangulation
Triangulation is a measurement system comprised of joined or overlapping triangles of angular observations supported by occasional distance and astronomic observations. Triangulation is used to extend horizontal control.
Network Geometry
| Order | First | Second | Second | Third | Third |
|---|---|---|---|---|---|
| Class | I | II | I | II | |
| Station spacing not less than (km) | 15 | 10 | 5 | 0.5 | 0.5 |
| Average minimum distance angle† of figures not less than | 40° | 35° | 30° | 30° | 25° |
| Minimum distance angle† of all figures not less than | 30° | 25° | 25° | 20° | 20° |
| Base line spacing not more than (triangles) | 5 | 10 | 12 | 15 | 15 |
| Astronomic azimuth spacing not more than (triangles) | 8 | 10 | 10 | 12 | 15 |
| † Distance angle is angle opposite the side through which distance is propagated. | |||||
The new survey is required to tie to at least four network control points spaced well apart. These network points must have datum values equivalent to or better than the intended order (and class) of the new survey. For example, in an arc of triangulation, at least two network control points should be occupied at each end of the arc. Whenever the distance between two new unconnected survey points is less than 20 percent of the distance between those points traced along existing or new connections, then a direct connection should be made between those two survey points. In addition, the survey should tie into any sufficiently accurate network control points within the station spacing distance of the survey. These network stations should be occupied and sufficient observations taken to make these stations integral parts of the survey. Nonredundant geodetic connections to the network stations are not considered sufficient ties. Nonredundantly determined stations are not allowed. Control stations should not be determined by intersection or resection methods. Simultaneous reciprocal vertical angles or geodetic leveling are observed along base lines. A base line need not be observed if other base lines of sufficient accuracy were observed within the base line spacing specification in the network, and similarly for astronomic azimuths.
Instrumentation
Only properly maintained theodolites are adequate for observing directions and
azimuths for triangulation. Only precisely marked targets, mounted stably on
tripods or supported towers, should be employed. The target should have a clearly
defined center, resolvable at the minimum control spacing. Optical plummets
or collimators are required to ensure that the theodolites and targets are centered
over the marks. Microwave-type electronic distance measurement (EDM) equipment
is not sufficiently accurate for measuring higher-order base lines.
| Order | First | Second | Second | Third | Third |
|---|---|---|---|---|---|
| Class | I | II | I | II | |
| Theodolite, least count | 0.2" | 0.2" | 1.0" | 1.0" | 1.0" |
Calibration Procedures
Each year and whenever the difference between direct and reverse readings of
the theodolite depart from 180° by more than 30", the instrument should
be adjusted for collimation error. Readjustment of the cross hairs and the level
bubble should be done whenever their misadjustments affect the instrument reading
by the amount of the least count.
All EDM devices and retroreflectors should be serviced regularly and checked frequently over lines of known distances. The National Geodetic Survey has established specific calibration base lines for this purpose. EDM instruments should be calibrated annually, and frequency checks made semiannually.
Field Procedures
Theodolite observations for first-order and second-order, class I surveys may
only be made at night. Reciprocal vertical angles should be observed at times
of best atmospheric conditions (between noon and late afternoon) for all orders
of accuracy. Electronic distance measurements need a record at both ends of
the line of wet and dry bulb temperatures to ±1°C, and barometric
pressure to ±5 mm of mercury. The theodolite and targets should be centered
to within 1 mm over the survey mark or eccentric point.
| Order | First | Second | Second | Third | Third |
|---|---|---|---|---|---|
| Class | I | II | I | II | |
| Directions | |||||
| Number of positions | 16 | 16 | 8 or 12† | 4 | 2 |
| Standard deviation of mean not to exceed | 0.4" | 0.5" | 0.8" | 1.2" | 2.0" |
| Rejection limit from the mean. | 4" | 4" | 5" | 5" | 5" |
| Reciprocal Vertical Angles (along distance sight path) | |||||
| Number of independent observations direct/reverse | 3 | 3 | 2 | 2 | 2 |
| Maximum spread | 10" | 10" | 10" | 10" | 20" |
| Maximum time interval between reciprocal angles (hr) | 1 | 1 | 1 | 1 | 1 |
| Astronomic Azimuths | |||||
| Observations per night | 16 | 16 | 16 | 8 | 4 |
| Number of nights | 2 | 2 | 1 | 1 | 1 |
| Standard deviation of mean not to exceed | 0.45" | 0.45" | 0.6" | 1.0" | 1.7" |
| Rejection limit from the mean | 5" | 5" | 5" | 6" | 6" |
| Electro-Optical Distances | |||||
| Minimum number of days | 2 * | 2 * | 1 | 1 | 1 |
| Minimum number of measurements/day | 2§ | 2§ | 2§ | 1 | 1 |
| Minimum number of concentric observations/measurement | 2 | 2 | 1 | 1 | 1 |
| Minimum number of offset observations/measurement | 2 | 2 | 2 | 1 | 1 |
| Maximum difference from mean of observations (mm) | 40 | 40 | 50 | 60 | 60 |
| Minimum number of readings/observation (or equivalent) | 10 | 10 | 10 | 10 | 10 |
| Maximum difference from mean of readings (mm) | § | § | § | § | § |
| Infrared Distances | |||||
| Minimum number of days | -- | 2 * | 1 | 1 | 1 |
| Minimum number of measurements | -- | 2§ | 2§ | 1 | 1 |
| Minimum number of concentric observations/measurement | -- | 1 | 1 | 1 | 1 |
| Minimum number of offset observations/ measurement | -- | 2 | 1 | 1 | 1 |
| Maximum difference from mean of observations (mm) | -- | 5 | 5 | 10 | 10 |
| Minimum number of readings/observation (or equivalent) | -- | 10 | 10 | 10 | 10 |
| Maximum difference from mean of readings (mm) | -- | § | § | § | § |
| Microwave Distances | |||||
| Minimum number of measurements | -- | -- | -- | 2 | 1 |
| Minimum time span between measurements (hr) | -- | -- | -- | 8 | -- |
| Maximum difference between measurements (mm) | -- | -- | -- | 100 | -- |
| Minimum number of concentric observations/measurement | -- | -- | -- | 2 ** | 1 ** |
| Maximum difference from mean of observations (mm) | -- | -- | -- | 100 | 150 |
| Minimum number of readings/observation (or equivalent) | -- | -- | -- | 20 | 20 |
| Maximum difference from mean of readings (mm) | -- | -- | -- | § | § |
| † 8 if 0.2", 12 if
1.0" resolution. * two or more instruments. § one measurement at each end of the line. § as specified by manufacturer. ** carried out at both ends of the line. |
|||||
Measurements of astronomic latitude and longitude are not required in the United States, except perhaps for first-order work, because sufficient information for determining deflections of the vertical exists. Detailed procedures can be found in Hoskinson and Duerksen (1952).
Office Procedures
| Order | First | Second | Second | Third | Third |
|---|---|---|---|---|---|
| Class | I | II | I | II | |
| Triangle Closure | |||||
| Average not to exceed | 1.0" | 1.2" | 2.0" | 3.0" | 5.0" |
| Maximum not to exceed | 3" | 3" | 5" | 5" | 10" |
| Side Checks | |||||
| Mean absolute correction by side equation not to exceed | 0.3" | 0.4" | 0.6" | 0.8" | 2.0" |
A minimally constrained least squares adjustment will be checked for blunders by examining the normalized residuals. The observation weights will be checked by inspecting the postadjustment estimate of the variance of unit weight. Distance standard errors computed by error propagation in this correctly weighted least squares adjustment will indicate the provisional accuracy classification. A survey variance factor ratio will be computed to check for systematic error. The least squares adjustment will use models which account for the following:
| semimajor axis of the ellipsoid | (a = 6378137 m) |
| reciprocal flattening of the ellipsoid | (1/f = 298.257222) |
| mark elevation above mean sea level | (known to ± 1 m) |
| geoid heights | (known to ± 6 m) |
| deflections of the vertical | (known to ± 3") |
| geodesic correction skew normal correction height of instrument height of target sea level correction arc correction geoid height correction second velocity correction crustal motion |
3.3 Traverse
Traverse is a measurement system comprised of joined distance and theodolite observations supported by occasional astronomic observations. Traverse is used to densify horizontal control.
Network Geometry
| Order | First | Second | Second | Third | Third |
|---|---|---|---|---|---|
| Class | I | II | I | II | |
| Station spacing not less than (km) | 10 | 4 | 2 | 0.5 | 0.5 |
| Maximum deviation of main traverse from straight line | 20° | 20° | 25° | 30° | 40° |
| Minimum number of bench mark ties | 2 | 2 | 2 | 2 | 2 |
| Bench mark tie spacing not more than (segments) | 6 | 8 | 10 | 15 | 20 |
| Astronomic azimuth spacing not more than (segments) | 6 | 12 | 20 | 25 | 40 |
| Minimum number of network control points | 4 | 3 | 2 | 2 | 2 |
The new survey is required to tie to a minimum number of network control points spaced well apart. These network points must have datum values equivalent to or better than the intended order (and class) of the new survey. Whenever the distance between two new unconnected survey points is less than 20 percent of the distance between those points traced along existing or new connections, then a direct connection must be made between those two survey points. In addition, the survey should tie into any sufficiently accurate network control points within the station spacing distance of the survey. These ties must include EDM or taped distances. Nonredundant geodetic connections to the network stations are not considered sufficient ties. Nonredundantly determined stations are not allowed. Reciprocal vertical angles or geodetic leveling are observed along all traverse lines.
Instrumentation
Only properly maintained theodolites are adequate for observing directions and
azimuths for traverse. Only precisely marked targets, mounted stably on tripods
or supported towers, should be employed. The target should have a clearly defined
center, resolvable at the minimum control spacing. Optical plummets or collimators
are required to ensure that the theodolites and targets are centered over the
marks. Microwave-type electronic distance measurement equipment is not sufficiently
accurate for measuring first-order traverses.
| Order | First | Second | Second | Third | Third |
|---|---|---|---|---|---|
| Class | I | II | I | II | |
| Theodolite, least count | 0.2" | 1.0" | 1.0" | 1.0" | 1.0" |
Calibration Procedures
Each year and whenever the difference between direct and reverse readings of
the theodolite depart from 180° by more than 30", the instrument should
be adjusted for collimation error. Readjustment of the cross hairs and the level
bubble should be done whenever their misadjustments affect the instrument reading
by the amount of the least count.
All electronic distance measuring devices and retroreflectors should be serviced regularly and checked frequently over lines of known distances. The National Geodetic Survey has established specific calibration base lines for this purpose. EDM instruments should be calibrated annually, and frequency checks made semiannually.
Field Procedures
Theodolite observations for first-order and second-order, class I surveys may
be made only at night. Electronic distance measurements need a record at both
ends of the line of wet and dry bulb temperatures to ±1oC,
and barometric pressure to ±5 mm of mercury. The theodolite, EDM, and
targets should be centered to within 1 mm over the survey mark or eccentric
point.
| Order | First | Second | Second | Third | Third |
|---|---|---|---|---|---|
| Class | I | II | I | II | |
| Directions | |||||
| Number of positions | 16 | 8 or 12† | 6 or 8 * | 4 | 2 |
| Standard deviation of mean not to exceed | 0.4" | 0.5" | 0.8" | 1.2" | 2.0" |
| Rejection limit from the mean. | 4" | 5" | 5" | 5" | 5" |
| Reciprocal Vertical Angles (along distance sight path) | |||||
| Number of independent observations direct/reverse | 3 | 3 | 2 | 2 | 2 |
| Maximum spread | 10" | 10" | 10" | 10" | 20" |
| Maximum time interval between reciprocal angles (hr) | 1 | 1 | 1 | 1 | 1 |
| Astronomic Azimuths | |||||
| Observations per night | 16 | 16 | 12 | 8 | 4 |
| Number of nights | 2 | 2 | 1 | 1 | 1 |
| Standard deviation of mean not to exceed | 0.45" | 0.45" | 0.6" | 1.0" | 1.7" |
| Rejection limit from the mean | 5" | 5" | 5" | 6" | 6" |
| Electro-Optical Distances | |||||
| Minimum number of measurements | 1 | 1 | 1 | 1 | 1 |
| Minimum number of concentric observations/measurement | 1 | 1 | 1 | 1 | 1 |
| Minimum number of offset observations/measurement | 1 | 1 | -- | -- | -- |
| Maximum difference from mean of observations (mm) | 60 | 60 | -- | -- | -- |
| Minimum number of readings/observation (or equivalent) | 10 | 10 | 10 | 10 | 10 |
| Maximum difference from mean of readings (mm) | § | § | § | § | § |
| Infrared Distances | |||||
| Minimum number of measurements | 1 | 1 | 1 | 1 | 1 |
| Minimum number of concentric observations/measurement | 1 | 1 | 1 | 1 | 1 |
| Minimum number of offset observations/measurement | 1 | 1 | 1§ | -- | -- |
| Maximum difference from mean of observations (mm) | 10 | 10 | 10§ | -- | -- |
| Minimum number of readings/ observation | 10 | 10 | 10 | 10 | 10 |
| Maximum difference from mean of readings (mm) | § | § | § | § | § |
| Microwave Distances | |||||
| Minimum number of measurements | -- | 1 | 1 | 1 | 1 |
| Minimum number of concentric observations/measurement | -- | 2 ** | 1 ** | 1 ** | 1 ** |
| Maximum difference from mean of observations (mm) | -- | 150 | 150 | 200 | 200 |
| Minimum number of readings/observation | -- | 20 | 20 | 10 | 10 |
| Maximum difference from mean of readings (mm) | -- | § | § | § | § |
| † 8 if 0.2", 12 if 1.0" resolution. * 6 if 0.2", 8 if 1.0" resolution. § as specified by manufacturer. § only if decimal reading near 0 or high 9's ** carried out at both ends of the line. |
|||||
Measurements of astronomic latitude and longitude are not required in the United States, except perhaps for first-order work, because sufficient information for determining deflections of the vertical exists. Detailed procedures can be found in Hoskinson and Duerksen (1952).
Office Procedures
| Order | First | Second | Second | Third | Third |
|---|---|---|---|---|---|
| Class | I | II | I | II | |
| Azimuth Closure at azimuth check point (seconds of arc) | 1.7√N | 3.0√N | 4.5√N | 10.0√N | 12.0√N |
| Position closure after azimuth adjustment † | 0.04√K or 1:100,000 |
0.08√K |
0.20√K or 1:20,000 |
0.40√K or 1:10,000 |
0.80√K or 1:5,000 |
|
(N is number of segments, K is route distance in km) |
|||||
A minimally constrained least squares adjustment will be checked for blunders by examining the normalized residuals. The observation weights will be checked by inspecting the postadjustment estimate of the variance of unit weight. Distance standard errors computed by error propagation in a correctly weighted least squares adjustment will indicate the provisional accuracy classification. A survey variance factor ratio will be computed to check for systematic error. The least squares adjustment will use models which account for the following:
| semimajor axis of the ellipsoid | (a = 6378137 m) |
| reciprocal flattening of the ellipsoid | (1/f = 298.257222) |
| mark elevation above mean sea level | (known to ± 1 m) |
| geoid heights | (known to ± 6 m) |
| deflections of the vertical | (known to ± 3") |
| geodesic correction skew normal correction height of instrument height of target sea level correction arc correction geoid height correction second velocity correction crustal motion |
3.4 Inertial Surveying
Inertial surveying is a measurement system comprised of lines, or a grid, of Inertial Surveying System (ISS) observations. These specifications cover use of inertial systems only for horizontal control.
Network Geometry
| Order | Second | Second | Third | Third |
|---|---|---|---|---|
| Class | I | II | I | II |
| Station spacing not less than (km) | 10 | 4 | 2 | 1 |
| Maximum deviation from straight line connecting endpoints | 20° | 25° | 30° | 35° |
Each inertial survey line is required to tie into a minimum of four horizontal network control points spaced well apart and should begin and end at network control points. These network control points must have horizontal datum values better than the intended order (and class) of the new survey. Whenever the shortest distance between two new unconnected survey points is less than 20 percent of the distance between those points traced along existing or new connections, then a direct connection should be made between those two survey points. In addition, the survey should connect to any sufficiently accurate network control points within the distance specified by the station spacing. The connections may be measured by EDM or tape traverse, or by another ISS line. If an ISS line is used, then these lines should follow the same specifications as all other ISS lines in the survey.
For extended area surveys by ISS, a grid of intersecting lines that satisfies the 20 percent rule stated above can be designed. There must be a mark at each intersection of the lines. This mark need not be a permanent monument; it may be a stake driven into the ground. For a position to receive an accuracy classification, it must be permanently monumented.
A grid of intersecting lines should contain a minimum of eight network points, and should have a network control point at each comer. The remaining network control points may be distributed about the interior or the periphery of the grid. However, there should be at least one network control point at an intersection of the grid lines near the center of the grid. If the required network points are not available, then they should be established by some other measurement system. Again, the horizontal datum values of these network control points must have an order (and class) better than the intended order (and class) of the new survey.
Instrumentation
ISS equipment falls into two types: analytic (or strapdown) and semianalytic.
Analytic inertial units are not considered to possess geodetic accuracy. Semianalytic
units are either "space stable" or "local level." Space stable systems maintain
the orientation of the platform with respect to inertial space. Local level
systems continuously torque the accelerometers to account for Earth rotation
and movement of the inertial unit, and also torque the platform to coincide
with the local level. This may be done on command at a coordinate update, or
whenever the unit achieves zero velocity (Zero velocity UPdaTe, or "ZUPT").
Independently of the measurement technique, the recorded data may be filtered
by an onboard computer. Because of the variable quality of individual ISS instruments,
the user should test an instrument with existing geodetic control beforehand.
An offset measurement device accurate to within 5 mm should be affixed to the inertial unit or the vehicle.
Calibration Procedures
A static calibration should be performed yearly and immediately after repairs
affecting the platform, gyroscopes, or accelerometers.
A dynamic or field calibration should be performed prior to each project or subsequent to a static calibration. The dynamic calibration should be performed only between horizontal control points of first-order accuracy and in each cardinal direction. The accelerometer scale factors from this calibration should be recorded and, if possible, stored in the onboard computer of the inertial unit.
Before each project or after repairs affecting the offset measurement device or the inertial unit, the relation between the center of the inertial unit and the zero point of the offset measurement device should be established.
Field Procedures
When surveying in a helicopter, the helicopter must come to rest on the ground
for all ZUPT's and all measurements.
| Order | Second | Second | Third | Third |
|---|---|---|---|---|
| Class | I | II | I | II |
| Minimum number of complete runs per line | 2 | 1 | 1 | 1 |
| Maximum deviation from a uniform rate of travel (including ZUPT) | 15% | 20% | 25% | 30% |
| Maximum ZUPT interval (ZUPT to ZUPT) (sec) | 200 | 240 | 300 | 300 |
A complete ISS measurement consists of measurement of the line while traveling in one direction, followed by measurement of the same line while traveling in the reverse direction (double-run). A coordinate update should not be performed at the far point or at midpoints of a line, even though those coordinates may be known.
The mark offset should be measured to the nearest 5 mm.
Office Procedures
| Order | Second | Second | Third | Third |
|---|---|---|---|---|
| Class | I | II | I | II |
| Maximum difference of smoothed coordinates between forward and reverse run (cm) | 60 | 60 | 70 | 80 |
A minimally constrained least squares adjustment of the raw or filtered survey data will be checked for blunders by examining the normalized residuals. The observation weights will be checked by inspecting the postadjustment estimate of the variance of unit weight. Distance standard errors computed by error propagation in this correctly weighted least squares adjustment will indicate the provisional accuracy classification. A survey variance factor ratio will be computed to check for systematic error. The least squares adjustment will use the best available model for the particular inertial system. Weighted averages of individually smoothed lines are not considered substitutes for a combined least squares adjustment to achieve geodetic accuracy.
3.5 Geodetic Leveling
Geodetic leveling is a measurement system comprised of elevation differences observed between nearby rods. Leveling is used to extend vertical control.
Network Geometry
| Order | First | First | Second | Second | Third |
|---|---|---|---|---|---|
| Class | I | II | I | II | |
| Bench mark spacing not more than (km) | 3 | 3 | 3 | 3 | 3 |
| Average bench mark spacing not more than (km) | 1.6 | 1.6 | 1.6 | 3.0 | 3.0 |
| Line length between network control points not more than (km) | 300 | 100 | 50 | 50 | 25 |
| (double-run) | |||||
| 25 | 10 | ||||
| (single-run) | |||||
New surveys are required to tie to existing network bench marks at the beginning and end of the leveling line. These network bench marks must have an order (and class) equivalent to or better than the intended order (and class) of the new survey. First-order surveys are required to perform check connections to a minimum of six bench marks, three at each end. All other surveys require a minimum of four check connections, two at each end. "Check connection" means that the observed elevation difference agrees with the adjusted elevation difference within the tolerance limit of the new survey. Checking the elevation difference between two bench marks located on the same structure, or so close together that both may have been affected by the same localized disturbance, is not considered a proper check. In addition, the survey is required to connect to any network control points within 3 km of its path. However, if the survey is run parallel to existing control, then the following table specifies the maximum spacing of extra connections between the survey and the control. At least one extra connection should always be made.
| Distance, survey | Maximum spacing of |
|---|---|
| to network | extra connections (km) |
| 0.5 km or less | 5 |
| 0.5 km to 2.0 km | 10 |
| 2.0 km to 3.0 km | 20 |
Instrumentation
| Order | First | First | Second | Second | Third |
|---|---|---|---|---|---|
| Class | I | II | I | II | |
| Leveling instrument | |||||
| Minimum repeatability of line of sight | 0.25" | 0.25" | 0.50" | 0.50" | 1.00" |
| Leveling rod construction | IDS | IDS | IDS†or ISS | ISS | Wood or Metal |
| Instrument and rod resolution (combined) | |||||
| Least count (mm) | 0.1 | 0.1 | 0.5-1.0 * | 1.0 | 1.0 |
| ( IDS - Invar, double scale) ( ISS - Invar, single scale) † if optional micrometer is used. * 1.0 mm if 3-wire method, 0.5 mm if optical micrometer. |
|||||
Only a compensator or tilting leveling instrument with an optical micrometer should be used for first-order leveling. Leveling rods should be one piece. Wooden or metal rods may be employed only for third-order work. A turning point consisting of a steel turning pin with a driving cap should be utilized. If a steel pin cannot be driven, then a turning plate ("turtle") weighing at least 7 kg should be substituted. In situations allowing neither turning pins nor turning plates (sandy or marshy soils), a long wooden stake with a double-headed nail should be driven to a firm depth.
Calibration Procedures
| Order | First | First | Second | Second | Third |
|---|---|---|---|---|---|
| Class | I | II | I | II | |
| Leveling instrument | |||||
| Maximum collimation error, single line of sight (mm/m) | 0.05 | 0.05 | 0.05 | 0.05 | 0.10 |
| Maximum collimation error, reversible compensator type instruments, mean of two lines of sight (mm/m) | 0.02 | 0.02 | 0.02 | 0.02 | 0.04 |
| Time interval between collimation error determinations not longer than (days) | |||||
| Reversible compensator | 7 | 7 | 7 | 7 | 7 |
| Other types | 1 | 1 | 1 | 1 | 7 |
| Maximum angular difference between two lines of sight, reversible compensator | 40" | 40" | 40" | 40" | 60" |
| Leveling rod | |||||
| Minimum scale calibration standard | N | N | N | M | M |
| Time interval between scale calibrations (yr) | 1 | 1 | -- | -- | -- |
| Leveling rod bubble verticality maintained to within | 10' | 10' | 10' | 10' | 10' |
| (N -- National standard) (M -- Manufacturer's standard) |
|||||
Compensator-type instruments should be checked for proper operation at least every 2 weeks of use. Rod calibration should be repeated whenever the rod is dropped or damaged in any way. Rod levels should be checked for proper alignment once a week. The manufacturer's calibration standard should, as a minimum, describe scale behavior with respect to temperature.
Field Procedures
| Order | First | First | Second | Second | Third |
|---|---|---|---|---|---|
| Class | I | II | I | II | |
| Minimal observation method | micrometer | micrometer | micrometer or 3-wire |
3-wire | center wire |
| Section running | SRDS or DR or SP | SRDS or DR or SP | SRDS or DR† or SP | SRDS or DR* | SRDS or DR§ |
| Difference of forward and backward sight lengths never to exceed | |||||
| per setup ( m ) per section (m) |
2 4 |
5 10 |
5 10 |
10 10 |
10 10 |
| Maximum sight length (m) | 50 | 60 | 60 | 70 | 90 |
| Minimum ground clearance of line of sight (m) | 0.5 | 0.5 | 0.5 | 0.5 | 0.5 |
| Even # of setups when not using leveling rods with detailed calibration | yes | yes | yes | yes | -- |
| Determine temperature gradient for the vertical range of the line of sight at each setup | yes | yes | yes | -- | -- |
| Maximum section misclosure (mm) | 3√D | 4√D | 6√D | 8√D | 12√D |
| Maximum loop misclosure (mm) | 4√E | 5√E | 6√E | 8√E | 12√E |
| Single-run methods | |||||
| Reverse direction of single runs every half day | yes | yes | yes | -- | -- |
| Nonreversible compensator leveling instruments | |||||
| Off-level/relevel instrument between observing the high & low rod scales | yes | yes | yes | -- | -- |
| 3-wire method | |||||
| Reading check (difference between top and bottom intervals) for one setup not to exceed (tenths of rod units) | -- | -- | 2 | 2 | 3 |
| Read rod 1 first in alternate setup method | -- | -- | yes | yes | yes |
| Double scale rods | |||||
| Low-high scale elevation difference for one setup not to exceed (mm) | |||||
| With reversible compensator | 0.40 | 1.00 | 1.00 | 2.00 | 2.00 |
| Other instrument types: Half-centimeter rods Full-centimeter rods |
0.25 0.30 |
0.30 0.30 |
0.60 0.60 |
0.70 0.70 |
1.30 1.30 |
| (SRDS -- Single-Run, Double Simultaneous
procedure) (DR -- Double-Run) (SP -- SPur, less than 25 km, double-run) D -- shortest length of section (one-way) in km E-perimeter of loop in km † Must double-run when using 3-wire method. * May single-run if line length between network control points is less than 25 km. § May single-run if line length between network control points is less than 10 km. |
|||||
Double-run leveling may always be used, but single-run leveling done with the double simultaneous procedure may be used only where it can be evaluated by loop closures. Rods should be leap-frogged between setups (alternate setup method). The date, beginning and ending times, cloud coverage, air temperature (to the nearest degree), temperature scale, and average wind speed should be recorded for each section plus any changes in the date, instrumentation, observer or time zone. The instrument need not be off-leveled/releveled between observing the high and low scales when using an instrument with a reversible compensator. The low-high scale difference tolerance for a reversible compensator is used only for the control of blunders.
With double scale rods, the following observing sequence should be used:
| backsight, low-scale backsight, stadia foresight, low-scale foresight, stadia off-level/relevel or reverse compensator foresight, high-scale backsight, high-scale |
Office Procedures
| Order | First | First | Second | Second | Third |
|---|---|---|---|---|---|
| Class | I | II | I | II | |
| Section misclosures (backward and forward) | |||||
| Algebraic sum of all corrected section misclosures of a leveling line not to exceed | 3√D | 4√D | 6√D | 8√D | 12√D |
| Section misclosure not to exceed (mm) | 3√E | 4√E | 6√E | 8√E | 12√E |
| Loop misclosures | |||||
| Algebraic sum of all corrected misclosures not to exceed (mm) | 4√F | 5√F | 6√F | 8√F | 12√F |
| Loop misclosure not to exceed (mm) | 4√F | 5√F | 6√F | 8√F | 12√F |
| (D -- shortest length of leveling line (one-way)
in km) (E -- shortest one-way length of section in km) (F -- length of loop in km) |
|||||
The normalized residuals from a minimally constrained least squares adjustment will be checked for blunders. The observation weights will be checked by inspecting the postadjustment estimate of the variance of unit weight. Elevation difference standard errors computed by error propagation in a correctly weighted least squares adjustment will indicate the provisional accuracy classification. A survey variance factor ratio will be computed to check for systematic error. The least squares adjustment will use models that account for:
| gravity effect or orthometric correction rod scale errors rod (Invar) temperature refraction-need latitude and longitude to 6" or vertical temperature difference observations between 0.5 and 2.5 m above the ground earth tides and magnetic field collimation error crustal motion |
3.6 Photogrammetry
Photogrammetry is a measurement system comprised of photographs taken by a precise metric camera and measured by a comparator. Photogrammetry is used for densification of horizontal control. The following specifications apply only to analytic methods.
Network Geometry
| Order | Second | Second | Third | Third |
|---|---|---|---|---|
| Class | I | II | I | II |
| Forward overlap not less than | 66% | 66% | 60% | 60% |
| Side overlap not less than | 66% | 66% | 20% | 20% |
| Intersecting rays per point not less than (design criteria) | 9 | 8 | 3 | 3 |
The photogrammetric survey should be areal: single strips of photography are not acceptable. The survey should encompass, ideally, a minimum of eight horizontal control points and four vertical points spaced about the perimeter of the survey. In addition, the horizontal control points should be spaced no farther apart than seven air bases. The horizontal control points should have an order (and class) better than the intended order (and class) of the survey. The vertical points need not meet geodetic control standards. If the required control points are not available, then they must be established by some other measurement system.
Instrumentation
| Order | Second | Second | Third | Third |
|---|---|---|---|---|
| Class | I | II | I | II |
| Metric Camera | ||||
| Maximum warp of platen not more than (μm) | 10 | 10 | 10 | 10 |
| Dimensional control not less than | reseau with maximum spacing of 2 cm |
8 fiducials | 8 fiducials | 8 fiducials |
| Comparator | ||||
| Least count (μm) | 1 | 1 | 1 | 1 |
The camera should be of at least the quality of those employed for large-scale mapping. A platen should be included onto which the film must be satisfactorily flattened during exposure. Note that a reseau should be used for second-order, class I surveys.
Calibration Procedures
| Order | Second | Second | Third | Third |
|---|---|---|---|---|
| Class | I | II | I | II |
| Metric Camera | ||||
| Root mean square of calibrated radial distortion not more than (μm) | 1 | 3 | 3 | 5 |
| Root mean square of calibrated decentering distortion not more than (μm) | 1 | 5† | 5† | 5† |
| Root mean square of reseau coordinates not more than (μm) | 1 | 1 | 3 | 3 |
| Root mean square of fiducial coordinates not more than (μm) | -- | 1 | 3 | 3 |
| † not usually treated separately in camera calibration facilities; manufacturer's certification is satisfactory. | ||||
The metric camera should be calibrated every 2 years, and the comparator should be calibrated every 6 months. These instruments should also be calibrated after repair or modifications.
Characteristics of the camera's internal geometry (radial symmetric distortion, decentered lens distortion, principal point and point of symmetry coordinates, and reseau coordinates) should be determined using recognized calibration techniques, like those described in the current edition of theManual of Photogrammetry.These characteristics will be applied as corrections to the measured image coordinates.
Field Procedures
Photogrammetry involves hybrid measurements: a metric camera photographs targets
and features in the field, and a comparator measures these photographs in an
office environment. Although this section is entitled "Field Procedures," it
deals with the actual measurement process and thus includes comparator specifications.
| Order | Second | Second | Third | Third |
|---|---|---|---|---|
| Class | I | II | I | II |
| Targets | ||||
| Control points targeted | yes | yes | yes | yes |
| Pass points targeted | yes | yes | optional | optional |
| Comparator | ||||
| Pointings per target not less than | 4 | 3 | 2 | 2 |
| Pointings per reseau (or fiducial) not less than | 4 | 3 | 2 | 2 |
| Number of different reseau intersections per target not less than | 4 | -- | -- | -- |
| Rejection limit from mean of pointings per target (μm) | 3 | 3 | 3 | 3 |
Office Procedures
| Order | Second | Second | Third | Third |
|---|---|---|---|---|
| Class | I | II | I | II |
| Root mean square of adjusted photocoordinates not more than (μm) | 4 | 6 | 8 | 12 |
A least squares adjustment of the photocoordinates, constrained by the coordinates of the horizontal and vertical control points, will be checked for blunders by examining the normalized residuals. The observation weights will be checked by inspecting the postadjustment estimate of the variance of unit weight. Distance standard errors computed by error propagation in this correctly weighted least squares adjustment will indicate the provisional accuracy classification. A survey variance factor ratio will be computed to check for systematic error. The least squares adjustment will use models that incorporate the quantities determined by calibration.
3.7 Satellite Doppler Positioning
Satellite Doppler positioning is a three-dimensional measurement system based on the radio signals of the U.S. Navy Navigational Satellite System (NNSS), commonly referred to as the TRANSIT system. Satellite Doppler positioning is used primarily to establish horizontal control.
The Doppler observations are processed to determine station positions in Cartesian coordinates, which can be transformed to geodetic coordinates (geodetic latitude and longitude and height above reference ellipsoid). There are two methods by which station positions can be derived: point positioning and relative positioning.
Point positioning, for geodetic applications, requires that the processing of the Doppler data be performed with the precise ephemerides that are supplied by the Defense Mapping Agency. In this method, data from a single station is processed to yield the station coordinates.
Relative positioning is possible when two or more receivers are operated together in the survey area. The processing of the Doppler data can be performed in four modes: simultaneous point positioning, translocation, semishort arc, and short arc. The specifications for relative positioning are valid only for data reduced by the semishort or short arc methods. The semishort arc mode allows up to 5 degrees of freedom in the ephemerides; the short arc mode allows 6 or more degrees of freedom. These modes allow the use of the broadcast ephemerides in place of the precise ephemerides.
The specifications quoted in the following sections are based on the experience gained from the analysis of Doppler surveys performed by agencies of the Federal government. Since the data are primarily from surveys performed within the continental United States, the precisions and related specifications may not be appropriate for other areas of the world.
Network Geometry
The order of a Doppler survey is determined by: the spacing between primary
Doppler stations, the order of the base network stations from which the primaries
are established, and the method of data reduction that is used. The order and
class of a survey cannot exceed the lowest order (and class) of the base stations
used to establish the survey.
The primary stations should be spaced at regular intervals which meet or exceed the spacing required for the desired accuracy of the survey. The primary stations will carry the same order as the survey.
Supplemental stations may be established in the same survey as the primary stations. The lowest order (and class) of a supplemental station is determined either by its spacing with, or by the order of, the nearest Doppler or other horizontal control station. The processing mode determines the allowable station spacing.
In carrying out a Doppler survey, one should occupy, using the same Doppler equipment and procedures, at least two existing horizontal network (base) stations of order (and class) equivalent to, or better than, the intended order (and class) of the Doppler survey. If the Doppler survey is to be first-order, at least three base stations must be occupied. If relative positioning is to be used, all base station base lines must be directly observed during the survey. Base stations should be selected near the perimeter of the survey, so as to encompass the entire survey.
Stations which have a precise elevation referenced by geodetic leveling to the National Geodetic Vertical Datum (NGVD) are preferred. This will allow geoidal heights to be determined. As many base stations as possible should be tied to the NGVD. If a selection is to be made, those stations should be chosen which span the largest portion of the survey.
If none of the selected base stations is tied to the NGVD, at least two, preferably more, bench marks of the NGVD should be occupied. An attempt should be made to span the entire survey area.
Datum shifts for transformation of point position solutions should be derived from the observations made on the base stations.
The minimum spacing, D, of the Doppler stations may be computed by a formula determined by the processing mode to be employed. This spacing is also used in conjunction with established control, and other Doppler control, to determine the order and class of the supplemental stations.
By using the appropriate formula, tables can be constructed showing station spacing as a function of point or relative one-sigma position precision (spor sr) and desired survey (or station) order.
Point Positioning
D = 2√2 spa
where
a = denominator of distance accuracy classification standard (e.g., a = 100,000 for first-order standard).
| Order | First | Second | Second | Third | Third |
|---|---|---|---|---|---|
| Class | I | II | I | II | |
| sp(cm) | D (km) | ||||
| 200 | 566 | 242 | 114 | 56 | 28 |
| 100 | 283 | 141 | 57 | 28 | 14 |
| 70 | 200 | 100 | 40 | 20 | 10 |
| 50 | 141 | 71 | 26 | 14 | 7 |
Relative Positioning
D = 2 sra
where
a = denominator of distance accuracy classification standard (e.g., a = 100,000 for first-order standard).
| Order | First | Second | Second | Third | Third |
|---|---|---|---|---|---|
| Class | I | II | I | II | |
| sr(cm) | D (km) | ||||
| 50 | 100 | 50 | 20 | 10 | 5 |
| 35 | 70 | 35 | 14 | 7 | 4 |
| 20 | 40 | 20 | 8 | 4 | 2 |
However, the spacing for relative positioning should not exceed 500 km.
Instrumentation
The receivers should receive the two carrier frequencies transmitted by the
NNSS. The receivers should record the Doppler count of the satellite, the receiver
clock times, and the signal strength. The integration interval should be approximately
4.6 sec. Typically six or seven of these intervals are accumulated to form a
30-second Doppler count observation. The reference frequency should be stable
to within 5.0(10-11) per 100 sec. The maximum difference from the
average receiver delay should not exceed 50 μsec.
The best estimate of the mean electrical center of the antenna should be marked.
This mark will be the reference point for all height-of-antenna measurements.
Calibration Procedures
Receivers should be calibrated at least once a year, or whenever a modification
to the equipment is made. It is desirable to perform a calibration before every
project to verify that the equipment is operational. The two-receiver method
explained next is preferred and should be used whenever possible.
Two-Receiver Method
The observations are made on a vector base line, of internal accuracy sufficient
to serve as a comparison standard, 10 to 50 m in length. The base line should
be located in an area free of radio interference in the 150 and 400 MHz frequencies.
The procedures found in the table on relative positioning in "Field Procedures"
under the 20 cm column heading will be used. The data are reduced by either
shortarc or semishort arc methods. The receivers will be considered operational
if the differences between the Doppler and the terrestrial base line components
do not exceed 40 cm (along any coordinate axis).
Single-Receiver Method
Observations are made on a first-order station using the procedures found in
the table on relative positioning in "Field Procedures" under the 50 cm column
heading. The data are reduced with the precise ephemerides. The resultant position
must agree within 1 m of the network position.
Field Procedures
The following tables of field procedures are valid only for measurements made
with the Navy Navigational Satellite System (TRANSIT).
Point Positioning
| sp(precise ephemerides) | 50 cm | 70 cm | 100 cm | 200 cm |
| Max. standard deviation of mean of counts/pass (cm), broadcast ephemeredes | 25 | 25 | 25 | 25 |
| Period of observation not less than (hr) | 48 | 36 | 24 | 12 |
| Number of observed passes not less than † | 40 | 30 | 15 | 8 |
| Number of acceptable passes (evaluated by on-site point processing) not less than | 30 | 20 | 9 | 4 |
| Minimum number of acceptable passes within each quadrant * | 6 | 4 | 2 | 1 |
| Frequency standard warm-up time (hr) crystal atomic |
48 1.5 |
48 1.5 |
24 1.0 |
24 1.0 |
| Maximum interval between meteorological observations (hr) | 6 | § | § | § |
| † Number of passes refers to those
for which the precise ephemerides are available fur reduction. * There should be a nearly equal number of northward and southward passes. § each setup, visit and takedown. |
||||
Relative positioning
| sr | 20 cm | 35 cm | 50 cm | |
| Maximum standard deviation of mean of counts/pass (cm), broadcast ephemeredes | 25 | 25 | 25 | |
| Period of observation not less than (hr) | 48 | 36 | 24 | |
| Number of observed passes not less than † | 40 | 30 | 15 | |
| Number of acceptable passes (evaluated by on-site point position processing) not less than | 30 | 20 | 9 | |
| Minimum number of acceptable passes within each quadrant * | 6 | 4 | 2 | |
| Frequency standard warm-up time (hr) crystal atomic |
48 1.5 |
48 1.5 |
48 1.5 |
|
| Maximum interval between meteorological observations (hr) | 6 | 6 | § | |
| † Number of observed passes refers
to all satellites available for tracking and reduction with the broadcast
or precise ephemerides. * Number of northward and southward passes should be nearly equal. § Each setup, visit and takedown. |
||||
The antenna should be located where radio interference is minimal for the 150 and 400 MHz frequencies. Medium frequency radar, high voltage power lines, transformers, excessive noise from automotive ignition systems, and high power radio and television transmission antennas should be avoided. The horizon should not be obstructed above 7.5°.
The antenna should not be located near metal structures, or, when on the roof of a building, less than 2 m from the edge. The antenna must be stably located within 1 mm over the station mark for the duration of the observations. The height difference between the mark and the reference point for the antenna phase center should be measured to the nearest millimeter. If an antenna is moved while a pass is in progress, that pass is not acceptable. If moved, the antenna should be relocated within 5 mm of the original antenna height; otherwise the data may have to be processed as if two separate stations were established. In the case of a reoccupation of an existing Doppler station, the antenna should be relocated within 5 mm of the original observing height.
Long-term reference frequency drift should be monitored to ensure it does not exceed the manufacturer's specifications.
Observations of temperature and relative humidity should be collected, if possible, at or near the height of the phase center of the antenna. Observations of wet-bulb and dry-bulb temperature readings should be recorded to the nearest 0.5°C. Barometric readings at the station site should be recorded to the nearest millibar and corrected for difference in height between the antenna and barometer.
Office Procedures
The processing constants and criteria for determining the quality of point and
relative positioning results are as follows:
1. For all passes for a given station occupation, the average number of Doppler
counts per pass should be at least 20 (before processing).
2. The cutoff angle for both data points and passes should be 7.5°.
3. For a given pass, the maximum allowable rejection of counts, 3 sigma postprocessing,
will be 10.
4. Counts rejected (excluding cutoff angle) for a solution should be less than
10 percent.
5. Depending on number of passes and quality of data, the standard deviation
of the range residuals for all passes of a solution should range between:
Point positioning-10 to 20 cm
Relative positioning-5 to 20 cm
A minimally constrained least squares adjustment will be checked for blunders by examining the normalized residuals. The observation weights will be checked by inspecting the postadjustment estimate of the variance of unit weight. Distance standard errors computed by error propagation between points in this correctly weighted least squares adjustment will indicate the maximum achievable accuracy classification. The formula presented in "Standards" will be used to arrive at the actual classification.
The least squares adjustment will use models which account for:
| tropospheric scale bias, 10 percent uncertainty receiver time delay satellite/receiver frequency offset precise ephemeris tropospheric refraction ionospheric refraction long-term ephemeris variations crustal motion |
3.8 Absolute Gravimetry
Absolute gravimetry is a measurement system which determines the magnitude of gravity at a station at a specific time. Absolute gravity measurements are used to establish and extend gravity control. Within the context of a geodetic gravity network, as discussed in "Standards," a series of absolute measurements at a control point is in itself sufficient to establish an absolute gravity value for that location.
The value of gravity at a point is time dependent, being subject to dynamic effects in the Earth. The extent of gravimetric stability can be determined only by repeated observations over many years.
Network Geometry
Network geometry cannot by systematized since absolute observations at a specific
location are discrete and uncorrelated with other points. In absolute gravimetry,
a network may consist of a single point.
A first-order, class I station must possess gravimetric stability, which only repeated measurements can determine. This gravimetric stability should not be confused with the accuracy determined at a specific time. It is possible for a value to be determined very precisely at two different dates and for the values at each of these respective dates to differ. Although the ultimate stability of a point cannot be determined by a single observation session, an attempt should be made to select sites which are believed to be tectonically stable, and sufficiently distant from large bodies of water to minimize ocean tide coastal loading.
The classification of first-order, class I is reserved for network points which have demonstrated long-term stability. To ensure this stability, the point should be reobserved at least twice during the year of establishment and thereaf